Staff does not see a need to impose specific conditions to satisfy this standard.
<br /> 4. mill be served adequately by and will not adversely affect essential public facilities and services including streets,police and fire
<br /> protection, drainage, refuse disposal, water and server systems,parks and schools;and mill not, in particular, create traffic
<br /> congestion or interference with traffic on adjacent and neighboring public thoroughfares.
<br /> The use will be served adequately by and will not adversely affect essential public facilities and services
<br /> including streets,police and fire protection,drainage, refuse disposal,water and sewer systems,parks and
<br /> schools; and will not,in particular, create traffic congestion or interference with traffic on adjacent and
<br /> neighboring public thoroughfares.
<br /> Staff does not see a need to impose specific conditions to satisfy this standard.
<br /> 5. mill not involve uses, activities,processes, materials, equipment and conditions of operation that will be detrimental to any
<br /> persons or property because of excessive traffic, noise, smoke,fumes,glare, odors, dust or vibrations.
<br /> While the project is an expansion of the operations,the increase of traffic generated by the site will be
<br /> minimal. The spacing of access points has been reviewed by the city engineer. Glare and noise generated
<br /> from the site will be mitigated by vegetation,buildings, and elevations changes. The use will not involve
<br /> uses, activities,processes, materials, equipment, and conditions of operation that will be detrimental to
<br /> any persons or property because of excessive traffic, noise, smoke, fumes,glare, odors, dust, or vibrations.
<br /> To ensure detrimental activities such as glare,noise,and traffic do not occur,the hours of operation shall
<br /> be limited to Monday—Friday, 8:00 a.m. —4:30 p.m., except for emergencies.
<br /> 6. mill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance.
<br /> Although trees will be removed and significant site work will be completed,the use will not result in the
<br /> destruction,loss or damage of a natural, scenic or historic feature of major importance.
<br /> Staff does not see a need to impose specific conditions to satisfy this standard.
<br /> 7. iVill fully co*ywitb all other requirements of this Code, including any applicable requirements and standards for the
<br /> issuance of a license or permit to establish and operate the proposed use in the city.
<br /> The use will fully comply with all other requirements of this Code,including any applicable requirements
<br /> and standards for the issuance of a license or permit to establish and operate the proposed use in the city.
<br /> Staff does not see a need to impose specific conditions to satisfy this standard.
<br /> If denial of such a permit should occur,it shall accompany recommendations or determinations by findings or a
<br /> report stating how the proposed use does not comply with the standards set forth in Section 30-654.
<br /> Financial Impact
<br /> None
<br /> Mission/Policy/Goal
<br /> Reflect the culture of citizens and what is important(continue service to residents) and meeting the changing
<br /> needs of the city.
<br />
|