Laserfiche WebLink
DocuSign Envelope ID: 27E728AB-E761-4D8D-8846-447BC430C75D <br />CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />containing Contractor's signed Certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />CROSSTOWN MASONRY, INCORPORATED <br />A B C D <br />E <br />APPLICATION NO.: 12 <br />APPLICATION DATE: 07/22/20 <br />PERIOD TO: 07/31/20 <br />PROJECT NO.: 19520-0033 <br />F G H <br />I <br />WORK COMPLETED <br />MATERIALS TOTAL <br />ITEM DESCRIPTION OF WORK <br />SCHEDULED <br />FROM PREVIOUS <br />PRESENTLY COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF <br />NUM <br />VALUE <br />APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN , AND STORED TO <br />(G + C) <br />FINISH (C - G) <br />VARIABLE RATE) <br />+ E) <br />D OR E) DATE <br />1 Concrete/Masonry (CO #1) ?' <br />$697.00' <br />$697.00' <br />$697.001 <br />100.00% <br />-' <br />$34.85 <br />1 Concrete/Masonry (CO #2) <br />$33,996.00 <br />_ $33,996.00 <br />$33,996.00 _ <br />100.00%, <br />- <br />$1,699.80 <br />1 ' Concrete/Masonry (CO #3) <br />($3,778.00) <br />_ ($3,778.00) <br />($3,778.00) _ <br />100.00% <br />- <br />($188.90)' <br />1 Concrete/Masonry (CO #4) <br />$689.00 <br />$689.00 <br />$689.00 <br />100.00% <br />- <br />$34.45' <br />1 ` Concrete/Masonry (CO #5) j <br />($15,209.00) <br />($15,209.00)' <br />= <br />($15,209.00) <br />100.00% <br />($760.45) <br />1 Concrete/Masonry (CO #6) 1 <br />$2,930.00 <br />$2,930.00 _ <br />I $2,930.00 <br />100.00% - <br />- <br />$146.50 <br />1 Concrete/Masonry (CO #7) <br />($8,500.00) <br />($8,500.00)' <br />j ($8,500.00) <br />100.00% <br />- <br />($425.00) <br />1 Concrete/Masonry (CO #6) <br />$11,039.00 <br />$11,039.00; <br />$11,039.00 <br />100.00% ` <br />- <br />$551.95 <br />1 ' Concrete/Masonry (CO #8) <br />($15,000.00) <br />_ ($15,000.00) <br />($15,000.00) _ <br />- <br />s"� 1 Concrete/Mason CO #9 <br />ry ( ) <br />$10,085.00 <br />$10,085.00 <br />$10,085.00 <br />100.00% _'. <br />$504.25 <br />1 Concrete/Masonry (CO #10) [ <br />($6,000.00) <br />($6,000.00)' <br />1 ($6,000.00) <br />100.00% <br />- <br />($300.00) <br />1 ;ConcretelMasonry (CO #11) <br />($9,351.00) <br />($9,351.00)' <br />($9,351.00) , <br />100.00% <br />($467.55) <br />1 ' Concrete/Masonry (CO #10) <br />($10,000.00) <br />($10,000.00) 3 <br />_ <br />($10,000.00) <br />100.00%. <br />- <br />($500.00) <br />1 1 Concrete/Masonry (CO #12) <br />($5,650.00) <br />($5,650.00) <br />($5,650.00) <br />100.00% _ <br />- ] <br />($282.50) <br />1 Concrete/Masonry (CO #13) <br />$2,275.00 <br />= <br />$2,275.00 <br />$2,275.00 _ <br />100.00%, <br />- _ <br />$113.75 <br />PAYMENT TOTALS <br />$2,923,223.00 <br />$2,880,598.00 j <br />$7,625.00 3 <br />- $2,888 223 00 <br />98.80%' <br />$35,000.001 <br />$144,411 15 <br />Page 2 of 2 <br />