Laserfiche WebLink
DocuSign Envelope ID: 27E728AB-E761-4D8D-8B46-447BC430C75D <br />'CONTINUATION SHEET <br />APPLICATION AND CERTIFICATION FOR PAYMENT, <br />APPLICATION NO.: <br />12 <br />containing Contractor's signed Certification is attached. <br />APPLICATION DATE: <br />07/22/20 <br />In tabulations below, amounts are stated to the nearest dollar. <br />PERIOD TO: <br />07/31/20 <br />CROSSTOWN MASONRY, INCORPORATED <br />PROJECT NO.: <br />19520-0033 <br />A <br />B <br />C <br />D j <br />E <br />F G <br />H ; <br />I <br />WORK COMPLETED <br />MATERIALS TOTAL <br />ITEM <br />DESCRIPTION OF WORK <br />SCHEDULED FROM PREVIOUS i <br />PRESENTLY COMPLETED <br />% <br />BALANCE TO <br />RETAINAGE (IF ; <br />NUM <br />VALUE APPLICATION (D <br />THIS PERIOD <br />STORED (NOT IN AND STORED TO <br />(G + C) <br />FINISH (C - G) ;VARIABLE <br />RATE ) <br />+ E) <br />D OR E) DATE <br />j <br />1 <br />Footings & Foundation Labor <br />$30,000.001 <br />$30,000.00 <br />$30,000.00' <br />100.00% <br />$1,500.00 <br />2 <br />Footings & Foundation Material <br />$81000.00 <br />$8,000.00 <br />$8,000.00 <br />100.00%- <br />$400.00 <br />3 <br />Above Grade CMU Labor <br />$84,000.00 <br />$84,000.00 r <br />t $84,000.00 <br />100.00% <br />$4,200.00 <br />4 <br />Above Grade CMU Material <br />$26,000.00 <br />$26,000.00 ? <br />$26,000.00 <br />100.00% 1$1,300.00 <br />1. <br />5 <br />Slab on Grade Labor <br />$5,300 00 <br />$5,300.00 = <br />$5,300.00 ? <br />100.00% <br />$265.00 <br />6 <br />Slab on Grade Material <br />$4,200.00 <br />$4,200.00 5 <br />$4,200.00 <br />100.00% <br />$210.00 <br />7 <br />Stone Piers Labor <br />$17,000.00 <br />$17,000.00 <br />-( <br />8 <br />' Stone Piers Material <br />$10,000.00 <br />i <br />i <br />$10,000.00 !' <br />- <br />9 <br />= Dug Outs/Batting Cage Labor <br />$41,000 00. <br />$41,000.00 f <br />$41,000.00' <br />100.00% <br />$2,050.00 <br />10 <br />Dug Outs/Batting Cage <br />$28,000.00 <br />$28,000.00 <br />$28,000.00 ; <br />100.00% <br />$1,400.00' <br />Material <br />11 <br />Footings & Foundation Labor <br />$415,000.00 <br />$415,000.00 ' <br />$415,000.00 <br />100.00% <br />$20,750.00 <br />12 <br />Footings & Foundation Material <br />$210,000.00 = <br />$210,000.00' <br />$210,000.00 ; <br />100.00% <br />$10,500.00 <br />13 <br />;Above Grade CMU Labor <br />$812,000.00 <br />$812,000.00 <br />$812,000.00 : <br />100.00% <br />$40,600.00 <br />14 <br />;Above Grade CMU Material <br />$348,000 00 <br />$348,000.00 <br />$348 000 00, <br />100.00% <br />$17,400.00 <br />15 <br />Slab on Grade Labor <br />$236,000.00 <br />$236,000.00 <br />[. $236 000 00 ; <br />100.00% <br />$11,800.00 , <br />=16 <br />:Slab on Grade Material <br />$210,000.00 <br />$210,000.00 - <br />- <br />i <br />$210,000.00 ^^ <br />100.00% _ <br />$10,500.00 <br />17 <br />Slab on Deck Labor <br />$140,000.00 <br />$140,000.00 <br />- <br />$140,000.00 , <br />100.00% ( <br />$7,000.00 <br />j 18 <br />Slab on Deck Material <br />$69,000 00 <br />$69,000.00 <br />- <br />$69 000.00 I <br />100.00% <br />$3,450.00 <br />19 <br />Stoops Labor <br />$8,000.00 <br />$8,000.00 _ <br />$8,000.00 j <br />100.00% <br />$400.00 <br />20 <br />Stoops Material <br />$2,000.00 € <br />$2,000.00. <br />$2,000.00 <br />100.00% <br />$100.00 <br />i 21 <br />Stone at Fireplace Labor <br />$8,000.00 € <br />$8,000.00 <br />@ $8,000.001 <br />100.00% <br />$400.00 r <br />I <br />22 <br />Stone at Fireplace Material <br />4 <br />$2,000.001 <br />$2,000.00 <br />E 7 <br />$2,000.001 <br />100.00% <br />$100.00 <br />23 <br />Concrete Allowance <br />$50,000.00 ` <br />$25,420.00 <br />$16,580.00 <br />i $42,000.001 <br />84.00% <br />$8,000.00 ° <br />$2,100.00 <br />124 <br />Masonry Allowance 3 <br />$40,000 00 <br />$20,229.00 <br />$19,771.00 <br />$40,000.00 <br />100.00% <br />$2,000.00 <br />125 <br />; Field House Labor i <br />$70,000.00 <br />$70,000.00 <br />$70,000.001 <br />100.00% <br />$3,500.00 <br />1 126 <br />Field House Material <br />$18,000 00 <br />$18.000.00. <br />$18,000.00' <br />100.00% <br />$900.00 <br />27 <br />;Bond <br />$43,500.00 € <br />$43,500.00' <br />$43,500.001 <br />100.00% <br />$2,175.00 <br />PAYMENT TOTALS; <br />$2,923,223.00 E <br />$2,880,598.00 = <br />$7,625.00 <br />$2,888,223.001 <br />98.80%1 <br />$35,000.00 € <br />$144,411.15 <br />Page 1 of 2 <br />