My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. HRSR 08-03-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2020-2029
>
2020
>
08-03-2020
>
8.2. HRSR 08-03-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2020 8:14:06 AM
Creation date
7/31/2020 8:09:35 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
8/3/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 5 <br />474751v3 CBR CR150-4 <br />4.Except for basement (garden level) apartments, each unit shall have a deck or patio. <br />5.The large arborvitaes along Welcome Avenue shall be removed from the property. <br />At a minimum the following tree planting is required for the property: <br />Plant two large-species deciduous shade trees. <br />In any yard, plant four other trees from the city’s approved tree species list <br />(attachment D). <br />6.Property Tax Status. The lot and the improvements thereon must remain on the property tax <br />rolls, shall be classified as taxable residential property, and may not be reclassified in any way <br />that makes it exempt from property taxes. <br />E.Building Permit Application Process. <br />When applying for a building permit to construct the new building, Builder will need to provide a complete <br />building permit application, including the following items: <br />Plans drawn by a licensed architect (3 copies) <br />Land Survey (3 copies) with building elevations, drainage patterns and easements <br />Energy Calculations <br />For a two-family dwelling: <br />Photo of the sign to be posted in accordance with City Code Section 403 <br />Escrow form <br />Questions regarding building permit forms, fees, inspections, etc. should be directed to the Administration <br />counter (763.531.1000). The Building Official and City staff will review all plans to assure conformance <br />with Builder's proposal, these Guidelines and the house plan approved by the City. If any element of the <br />plan is in conflict with the above criteria, City staff will notify Builder of any conflicts and note which <br />changes are required. Unless the modifications can be clearly indicated on the originally submitted plans, <br />Builder shall submit revised plans for final approval by the Building Official and City staff. <br />F.List of Attachments: <br />A.Map and 2018 aerial showing location of subject property <br />B.Property survey updated May 15, 2019 <br />C.Utility locations <br />D.List of trees species allowed for planting
The URL can be used to link to this page
Your browser does not support the video tag.