Laserfiche WebLink
Division Performance Measures & Goals for 2021 <br />Division:Street <br />Completed by:Tim Sevcik <br />Performance Measure2019 Actual2020 Estimated2021 Projected <br />Centerline Miles of <br />Bitumunous Roadway153155156 <br />Crack Seal Miles102020 <br />Street Sweeping222 <br />ROW Maintenance Mowing222 <br />Parking Lots202121 <br />Division GoalGoal Objective/Task <br />Meet / exceed approved timelines for snow removal. <br />Continue to reduce road salt usage while maintaining <br />Snow and Ice Control <br />safe winter driving surfaces through utilization of new <br />equipment and applying BMPs for chemical application. <br />Crack seal, pothole repair, mill and overlay, reclamation, <br />and other procedures to maintain bitumunous roadways <br />Utilize BMPs to extend pavement life <br />in good condition. Extend these maintenance practices <br />to city parkings lots and trails. <br />Install and improve utilization of Precise data logging <br />program in critical equipment to track performance and <br />Utilize technology on critical equipment <br />progress for tandum axel plow trucks, secondary snow <br />and ice control equipment, and mowing equipment. <br />