My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1.c. PCSR 06-23-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
06-23-2020
>
4.1.c. PCSR 06-23-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2020 8:36:06 AM
Creation date
6/19/2020 8:07:04 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
6/23/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Will be consistent with the Comprehensive Plan. <br /> The property does not currently comply with the Comprehensive Plan, and a land use amendment is <br /> required to satisfy this condition. If a land use amendment is granted, the proposed project will be <br /> consistent with the Comprehensive Plan. <br /> Without approval of the Comprehensive Plan amendment the project will not meet this condition of <br /> approval and would need to be recommended for denial. <br /> 3. mill not impede the normal and orderly development and improvement of surrounding vacant property. <br /> Most of the surrounding properties are developed,but there are two vacant developable commercial <br /> parcels in the development. The proposed subdivision will not impact reasonable development of <br /> neighboring land. <br /> 4. mill be served adequately by and will not adversely affect essential public facilities and services including streets,police <br /> and fire protection, drainage, refuse disposal, mater and sewer systems,parks and schools;and will not, in particular, <br /> create traffic congestion or interference with traffic on adjacent and neighboring public thoroughfares. <br /> The residential use will create an increased traffic demand for this development. However,any new <br /> use on the parcel will increase traffic in the area.A 60-unit residential building will generate an <br /> estimated 360 trips/day (6 per unit) while a 20,000 SF retail space would generate between 1,000 and <br /> 3,000 trips based on the specific store. <br /> The use will be served adequately by and will not adversely affect essential public facilities and services <br /> including streets,police and fire protection,drainage, refuse disposal,water and sewer systems,parks <br /> and schools; and will not,in particular, create traffic congestion or interference with traffic on adjacent <br /> and neighboring public thoroughfares. <br /> 5. Will not involve uses, activities,processes, materials, equipment and conditions of operation that will be detrimental to <br /> any persons or property because of excessive traffic, noise, smoke,fumes,glare, odors, dust or vibrations. <br /> Potential traffic concerns are outlined in condition 4,and the proposed residential use will not involve <br /> uses, activities,processes, materials, equipment, or conditions that will be detrimental to other <br /> properties. <br /> 6. mill not result in the destruction, loss or damage of a natural, scenic or historic feature of major importance. <br /> Grading is proposed to create minimal impacts to natural areas and some trees may be removed, and <br /> the use will not result in the destruction of scenic or historic feature of major importance. <br /> 7. mill fully co*ywith all other requirements of this Code, including any applicable requirements and standards for <br /> the issuance of a license orpermit to establish and operate the proposed use in the city. <br /> The conditions included in the recommendation for approval would ensure the subdivision will fully <br /> comply with all requirements of this code. <br /> Additionally, Sec 30-1564 describes the standards for establishment of a PUD district. <br /> 1. Land will be Zoned into the PUD Zoning district only upon approval of a concept plan for the PUD,pursuant <br /> to the procedure set forth in this section.A PUD will be authorized on land in a PUD Zoning district only upon <br /> issuance of a conditional use permit,pursuant to the procedure set forth in this section. <br /> A Conditional Use Permit will be issued in accordance with the above standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.