My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.5. SR 07-18-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
07/18/2005
>
6.5. SR 07-18-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 3:30:09 PM
Creation date
7/15/2005 11:16:01 AM
Metadata
Fields
Template:
City Government
type
SR
date
7/18/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Kenneth Stevens: Rationale for Revised Estimated Hours for 2005 <br /> <br />Contract Amendment #4 to Agreement for Professional Services (Contract No. 2003- <br />0264C) <br /> <br />Basis: <br />The estimated hours for 2005 are based upon historical requests for services and the level <br />of effort estimated to complete advanced and final design of the Northstar Project. The <br />level of effort is based upon the revised Northstar Project Organizational structure wherein <br />Kenneth Stevens is assigned the position of Project Oversight Consultant representing the <br />NCDA in technical issues and project development. In addition, Mr. Stevens is assigned the <br />role of Chairman of the Project Advisory Committee. All of these assignments are <br />consistent with the Scope of Services detailed within the referenced Contract. <br /> <br />At the beginning of the year, both the Project Deputy Director of Design and the Assistant <br />Deputy Director of Design resigned to pursue other employment. In the interim, Mr. <br />Stevens has been assigned the additional position of Acting Deputy Director of Design <br />along with Mr. Jon Olson of Anoka County. This interim position has resulted in Mr. <br />Stevens being far more directly involved in managing the design consultant contracts for <br />both Technical Services and Commuter Rail Stations and Maintenance Facilities. This <br />additional assignment, which is expected to continue through August when a new Deputy <br />Director of Design is anticipated, has resulted in expending far more time than originally <br />estimated. <br /> <br />In addition to the unanticipated temporary assignment, the nature of the project with a new <br />organization structure, continuing prolonged negotiations with BNSF, considerable <br />interaction and meetings with city staff regarding design, permits, approvals, and TOD, <br />and the many requirements of FT A, have required a greater than expected time <br />commitment. Of further consideration is the recent agreement with BNSF on an <br />Engineering Contract, which will require Mr. Stevens to provide coordination and liaison <br />between the BNSF, their engineering consultant, and the Northstar design consultants. <br /> <br />Summary: <br />The number of hours estimated in the original contract for services provided through <br />December 31, 2005 are based upon three days per week, or 24 hours. Currently, Mr. <br />Stevens is expending about 36 hours per week, or about 50 percent more time than <br />anticipated. This time commitment is expected to continue through the end of 2005. <br /> <br />Contract Amount: <br />The contract Total is $300,000 from inception to end of 2005. <br />The amount expended through May 31,2005 is $235,717.78. <br />Estimated Hours per month June-December is 144 which amountsto $18,000/month. <br />Estimated Direct Expense for June-December is $8,000.00. <br /> <br />Estimated Cost 6/1-12/3/05 <br />Contract Balance as of 5/31/05 <br />Balance Required through 12/31/05 <br /> <br />$134,000.00 <br />64,000.00 <br />$ 70,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.