My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 5-12-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2020
>
05-12-2020
>
4.1 ERMUSR 5-12-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2020 11:17:41 AM
Creation date
5/11/2020 11:16:39 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/12/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Each service shall enter the building served thereby at a point readily accessible at all times, and as <br />close as possible to the point of service from the main. <br />Twostop valves(ball type) shall be installed on each water service pipeat a point designated by the Elk <br />River Municipal Utilities, usually on each side ofthe meter. A service lineshall supply no more than one <br />premise unless conditions make it impossible and inadvisable in the judgment of the Elk River Municipal <br />Utilities General Manager. <br />Water service shall be placed at least six (6) feet in depth below grade andseven and one half (7½) feet <br />beneath the street, throughout their length. <br />RESIDENTIAL HOME BUILDER / OWNER <br />a)Home Builder / Owner shall complete the City Water Connection & Repair permit at 13069 Orono <br />Parkwayin Elk River. <br />b)All Street disruption and Water Access fees must be paid before connecting to the City Water <br />System. <br />c) All water service curb stops that are required to be located must be called in to the Water utilities at <br />least 24 hours prior to digging (except emergencies), rush jobs do not constitute an emergency. <br />d)All water connections must be inspected by the City Water Department or their designated inspector <br />prior to back filling of water service trench. A 24 hour advance notice is required. Slope of trench <br />must be in accordance with OSHA rules. If this is not possible, a trench box shall be installed for <br />inspections. <br />e)Where pressure reducers are required, the pressure reducer (supplied by plumber) will be located <br />on the house side of the meter and afterthe second valve. <br />f) Connection and Meter fees <br />before delivery of the meter will be made. (see section 106 for WAC fees and Connection charges) <br />g)Plumber shall install meter. The radio read generator and ERT are generally attached tothe meter. <br />h)Notification by the plumber that the water meter has been set and ready for seal and inspection by <br />Utility personnelshall be done at least 24 hours prior to final plumbing inspection by the City <br />Building Inspection Department. No Certificate of Occupancy (C.O.) will be issued until meter is <br />sealed and radio read has been installed by Water Utility. <br />COMMERCIAL / INDUSTRIAL DEVELOPER <br />a)Execute Developers agreement with the City of Elk River. <br />b)Provide 3 (three) plat maps with easements and CADD diskette of plat. <br />c) Payment of partial WAC fee per Section 106. <br />d)Developer will design with City/Utility approval, water main system within platted area and install the <br />same per City/Utility specifications. <br />e)All street disruption and water access fees must be paid before connecting to the City Water <br />System. <br />f) All water service valves that are required to be located must be called in to the Water Utility at least <br />24 hours prior to digging (except emergencies), rush jobs do not constitute an emergency. <br />g)All water connections must be inspected by the City Water department or their designated inspector <br />prior to back filling of water service trench. A 24 hour advance notice is required. Slope of trench <br />must be in accordance with OSHA rules. If this is not possible, a trench box shall be installed for <br />inspections. <br />h) <br />i) Where pressure reducers are required, the pressure reducer (supplied by plumber) will be located <br />on the house side of the meter and before the secondvalve. <br />j) Connection, Access and Meter fees must be paid and a plumbing permit number supplied before <br />delivery of the water meter will be made. The WAC fee will be paid at this time upon determination <br />of total WAC units which is a function of building occupancy and is determined by the City Building <br />Official. <br />k) <br />valve shall be utilized. <br />l) Plumber shall install meterwith radmeters will require a <br />meter by-pass loop. <br />m)In some instances, radio read meters do not work well in industrial type buildings and hard wired <br />remote readers will be required. All wiring for remote read meters shall be installed by the plumbing <br />contractor before rough in inspection. At time of final inspection, the Water Utilities will install the <br />remote, inspect and seal the meter. <br />6 <br />94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.