Laserfiche WebLink
ENRICHING LIVES AND STRENGTHENING COMMUNITIES | 1 <br /> <br /> <br />Architectural Design Services and Construction Support for the Expansion of the Elk River <br />Public Safety Building and Fire Station No. 3 Design/Construction <br />_____________________________________________________________________________________ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Attachment A <br /> <br />RESPONDENT PROPOSAL <br /> <br /> <br />The firm hereby proposes to provide Design Services and other Services as specified within the <br />scope of service at the rates shown below. <br /> <br />Based on the scope of work for this project, what is your fixed fee? What are your estimated total <br />reimbursable expenses? <br /> <br /> <br />Fixed fee: <br />Reimbursable expenses: <br /> <br /> <br /> <br />SShhaa dd ee dd aa rree aa wwii ll ll bbee rree dd aa cc ttee dd aa nndd rree pp llaa cc ee dd ww ii tthh aa RR ee ss ppoonn dd ee nntt ii dd ee nn ttii ffii cc aa ttii oonn cc oodd ee pprrii oorr ttoo ee vvaa ll uu aa ttii oonn .. <br /> <br />Firm: <br /> <br />Contact: <br />Telephone: <br />E-mail: <br />Address: <br /> <br />City/State/Zip: <br />Authorized Signature <br />X Date <br />Name and Title: <br />$558,000 <br />$25,000 <br />BKV Group <br />Bruce Schwartzman <br />612.790.7605 <br />bschwartzman@bkvgroup.com <br />222 North 2nd Street <br />Suite 101 <br />Minneapolis, MN 55401 <br />Bruce Schwartzman, Lead Architect & Partner <br />Our team’s compensation goals are to establish fees that fair and appropriate for the work required to achieve <br />your project goals while assuring that both our client and firm feel they are treated fairly for the services and <br />expertise provided. To meet this goal, we strive to establish a well-defined project understanding and scope <br />of services so that an appropriate fee structure can be determined. We have established our fees based our <br />experience in doing this type of work and the information in the RFP. <br />We would urge the committee to select your team based on experience and qualifications. While we feel that the <br />proposed fixed fee is in line with the work as stated in the RFP, our first task in working with the City of Elk River will be <br />to meet to make sure that our assumption for the project scope and schedule aligns with the city’s expectations <br />and goals.