Laserfiche WebLink
r <br />Conclusion: <br />The existing parking lot for the Elk River High School is nearing the end of its usable life and needs <br />repairs. Rather then replacing the parking lot to match the existing conditions, the School District is <br />taking advantage of this project to address some of the fundamental safety and functionality <br />concerns with the current site layout. The proposed improvements will improve safety for the <br />students and general public, while improving the traffic flow within the site and on School Street. <br />The proposed improvements will be an added benefit to the school and surrounding community. <br />If you have any questions, please contact me. <br />Sincerely, <br />BKBM ENGINEERS <br />.14,Z, -[. -9,&0 <br />Kevin Bohl <br />Direct Line: (763) 843-0427 <br />Copy: Tom Baranick, ISD #728 <br />Justin Wendt, Wold Architects and Engineers <br />F:\17\17445\17445.01\Correspondence\Governing Agencies\Permits\City\2020 Elk River High School Parking Lot Narrative - KAB.docx <br />Page 3 <br />