My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1. PCSR 03-02-2020
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2020
>
03-02-2020 SPECIAL
>
3.1. PCSR 03-02-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/4/2020 9:54:53 AM
Creation date
2/27/2020 12:41:49 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/2/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Conclusion: <br />The existing parking lot for the Elk River High School is nearing the end of its usable life and needs <br />repairs. Rather then replacing the parking lot to match the existing conditions, the School District is <br />taking advantage of this project to address some of the fundamental safety and functionality <br />concerns with the current site layout. The proposed improvements will improve safety for the <br />students and general public, while improving the traffic flow within the site and on School Street. <br />The proposed improvements will be an added benefit to the school and surrounding community. <br />If you have any questions, please contact me. <br />Sincerely, <br />BKBM ENGINEERS <br />.14,Z, -[. -9,&0 <br />Kevin Bohl <br />Direct Line: (763) 843-0427 <br />Copy: Tom Baranick, ISD #728 <br />Justin Wendt, Wold Architects and Engineers <br />F:\17\17445\17445.01\Correspondence\Governing Agencies\Permits\City\2020 Elk River High School Parking Lot Narrative - KAB.docx <br />Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.