My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assist MDH staff in updating the IWMZ inventory for the public <br />23 <br />water supply wells. Contact your MDH Planner if changes to the <br />locations or construction of potential contaminant sources are <br />L5ERMU, MDH <br />x <br />proposed in the IWMZ. <br />Staff Time <br />Measure <br />Develop policies and procedures for an Emergency Water Plan <br />dealing with derailment as to the proximity of the Railroad and <br />Hwy #10 to Wells # 2 and Well #3 <br />H5ERMU x <br />Staff Time <br />Measure 24 <br />Reporting and Evaluation <br />ERMUImplementation time frame <br />Action Alone <br />Unless <br />Description <br />Cooperator is <br />Cost <br />2013201420152016201720182019202020212022 <br />Priority <br />Measure <br />Noted <br />Objective <br />Addressed <br />Document all wells that have been sealed by keeping track of the <br />5 <br />2 <br />property owners name, address and parcel number of the well <br />location, and share with Sherburne County. If possible, request a <br />4ERMU <br />M <br />As Needed <br />well sealing log from the property owner or well driller who <br />Staff Time <br />sealed the well. <br />Measure <br />Prepare an assessment of WHP plan implementation efforts every <br />6 <br />2 <br />2 ½ years.Request assistance from MDH Planner and MRWA. <br />ERMU, <br />L <br />4MDH, <br />xxx <br />MRWA <br />Staff Time <br />Measure <br />Summarize all WHP Plan implementation efforts in a report to <br />7 <br />th <br />MDH in the 8year. <br />ERMU, <br />L4MDH, <br />x <br />MRWA <br />Staff Time <br />Measure 2 <br />18 <br />412 <br />
The URL can be used to link to this page
Your browser does not support the video tag.