My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data Collection <br />ERMUImplementation time frame <br />Action Alone <br />Unless <br />Description <br />Cooperator is <br />Cost <br />2013201420152016201720182019202020212022 <br />Priority <br />Measure <br />Noted <br />Objective <br />Addressed <br />Have Well #5 sampled for stable isotopes of oxygen (180) and <br />deuterium (2H) and several general chemistry parameters on water <br />9 <br />produced to assess the degree to which surface waters may be <br />1 <br />contributing to the well. Have MDH staff and MDH hydro ERMU, <br />3 <br />x <br />M <br />geologist assist in the collection and evaluation of the sampling of MDH <br />Staff Time <br />surface waters up-gradient of Well #5 as needed. Apply for a <br />Measure <br />SWP grant to help pay associated costs.Contact MDH as to <br />availability of grant Programs <br />Evaluate reasons for younger water being produced at Well #5. <br />Evaluate the downward groundwater leakage from shallower <br />ERMU, <br />aquifers and overlying surface bodies into the Mount Simon- <br />3 <br />x <br />M <br />MDH <br />Hinckley aquifer. <br />Measure 20 <br />IWMZ Management <br />ERMUImplementation time frame <br />Action Alone <br />ive <br />Unless <br />Description <br />Cost <br />Cooperator is <br />2013201420152016201720182019202020212022 <br />Priority <br />Measure <br />Object <br />Addressed <br />Noted <br />Implement measures that are specified in the IWMZ PCSI report <br />21 <br />5ERMU <br />M <br />Annually <br />Staff Time <br />Measure <br />Monitor and maintain the 200 ft. radius around the wells to ensure <br />22 <br />that setback distances for new potential contamination sources are <br />re <br />met. <br />5ERMU <br />M <br />Annually <br />Staff Time <br />Measu <br />17 <br />411 <br />
The URL can be used to link to this page
Your browser does not support the video tag.