My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.0 Water Towers / Filter Plants <br />A. Back-flush schedules and filter maintenance. <br />B. Inspect Towers for external damage. <br />C. Inspect Towers for Internal damage annually. <br />6.0 Booster Stations <br />A. Inspect weekly. <br />B. Run pumps monthly. <br />C. Adjust PRV per system requirements. <br />7.0 Meters <br />A. Meter number with size, type, manufacturer, date, meter index, location. <br />B. Large meter testing program, once every five years. <br />C. Small meter change out program, no meter older than 25 years. <br />D. Inspect and seal new water meter installations. <br />8.0 Backflow Prevention Program <br />A. Continue implementation of established written program with City Building Official. <br />9.0Telemetry System SCADA <br />A. Inspect instrumentation annually. <br />B. Inspect radio w/Battery back-up monthly. <br />C. Spare parts list from System Control Services. <br />D. Keep pumping and tower level information for future reference. <br />360 <br />
The URL can be used to link to this page
Your browser does not support the video tag.