Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />TABLE 5A <br />Metering, Monitoring and Control Requirements <br />Generation System Generation <br />Generation Remote <br />Metering <br />Capacity at Point of Remote <br />Monitoring <br />Common CouplingControl <br />Bi-Directional metering at the point <br />None RequiredNone Required <br />Area EPSof common coupling <br />>40 kW Determined by engineering studyDetermined by Determined by <br />engineering study <br />engineering <br />study <br />342 <br />