My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />5.Generation Metering, Monitoring and Control <br />Metering, Monitoring and Control Depending upon the method of interconnection and the size of the <br />Generation System, there are different metering, monitoring and control requirements Table 5A is a <br />table summarizing the metering, monitoring and control requirements. <br />Due to the variation in Generation Systems and Area EPS operational needs, the requirements for <br />metering, monitoring and control listed in this document are the expected maximum requirements that <br />the Area EPS will apply to the Generation System. It is important to note that for some Generation <br />System installations the Area EPS may wave some of the requirements of this section if they are not <br />needed. An example of this is with rural or low capacity feeders which require more monitoring then <br />larger capacity, typically urban feeders. <br />Another factor which will affect the metering, monitoring and control requirements will be the tariff <br />under which the Interconnection Customer is supplied by the Area EPS. Table 5A has been written to <br />cover most application, but some Area EPS tariffs may have greater or less metering, monitoring and <br />control requirements then, as shown in Table 5A. . <br />341 <br />
The URL can be used to link to this page
Your browser does not support the video tag.