Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />5.Generation Metering, Monitoring and Control <br />Metering, Monitoring and Control Depending upon the method of interconnection and the size of the <br />Generation System, there are different metering, monitoring and control requirements Table 5A is a <br />table summarizing the metering, monitoring and control requirements. <br />Due to the variation in Generation Systems and Area EPS operational needs, the requirements for <br />metering, monitoring and control listed in this document are the expected maximum requirements that <br />the Area EPS will apply to the Generation System. It is important to note that for some Generation <br />System installations the Area EPS may wave some of the requirements of this section if they are not <br />needed. An example of this is with rural or low capacity feeders which require more monitoring then <br />larger capacity, typically urban feeders. <br />Another factor which will affect the metering, monitoring and control requirements will be the tariff <br />under which the Interconnection Customer is supplied by the Area EPS. Table 5A has been written to <br />cover most application, but some Area EPS tariffs may have greater or less metering, monitoring and <br />control requirements then, as shown in Table 5A. . <br />341 <br />