My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />17.7.In the event that the Area EPS Operator determines a site survey is necessary in order <br />to complete a Facilities Study, the Interconnection Customer shall make good faith <br />efforts to complete the survey in a timely manner. <br />17.8.The Facilities Study assumes all land use permits required for the interconnection will <br />be approved by the proper authorities. Permits are submitted after Interconnection <br />Agreement is signed and may impact project costs (i.e. overhead to underground <br />requirements.) <br /> <br />17.9.The Interconnection Customer and Area EPS Operator shall provide a single point of <br />contact for design and construction related matters. The Interconnection Customer <br />questions during the Facilities Study. <br /> <br />17.10.In the event that an Interconnection Customer does not provide the necessary <br />information described in this Agreement, or if the Interconnection Customer takes <br />more than five (5) Business Days to respond to a question during the Facilities Study, <br />the Facilities Study timeframe shall pause until the question is resolved. <br /> <br /> <br /> <br />M-MIP Facility Study Agreement _January 2019 7 <br /> <br />268 <br />
The URL can be used to link to this page
Your browser does not support the video tag.