SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />10.2.Timelines <br />Within ten (10) Business Days of receipt of the proposed modification, the Area EPS <br />Operator shall evaluate whether the proposed modification to the Interconnection <br />Application constitutes a Material Modification. The definition in the Section 13 Glossary <br />of the Process Overview document includes examples of what does and does not <br />constitute a Material Modification. <br /> <br />The Area EPS Operator shall notify the Interconnection Customer in writing of the final <br />determination of the proposed modification. For proposed modifications that are <br />determined to be a Material Modification the Interconnection Customer may choose to <br />either: 1) withdraw the proposed modification; or 2) proceed with a new <br />Interconnection Application. The Interconnection Customer shall provide its choice in <br />writing to the Area EPS Operator within ten (10) Business Days after being provided the <br />Material Modification determination. If the Interconnection Customer does not provide <br />its choice within the timeline, the Interconnection Application shall be considered <br />withdrawn. <br /> <br />If the proposed modification is not determined to be a Material Modification, then the <br />Area EPS Operator shall notify the Interconnection Customer in writing that the <br />modification has been accepted and the Interconnection Customer shall retain its <br />eligibility for interconnection, including its position in the queue. <br /> <br />11Interconnection <br />11.1.Interconnection Milestones <br />For DER systems that are not a qualifying facility less than 40 kW AC, the <br />Interconnection Customer and the Area EPS Operator shall agree on milestones for <br />which each Party is responsible and list them in Attachment IV in the Interconnection <br />Agreement. To the greatest extent possible, the Parties will identify all design, <br />procurement, installation and construction requirements associated with the project <br />while also clearly identifying associated timelines, at the beginning, or as early within <br />the process as possible, of the design, procurement, installation and construction phase. <br /> <br />anticipates that they will be unable to meet a milestone for any reason other than a <br />Force Majeure Event, they shall immediately notify the other Party of the reason(s) for <br />not meeting the milestone, then propose the earliest reasonable alternative date in <br />which this and future milestones will be met and request appropriate amendments to <br />the Interconnection Agreement and its attachments. The Party affected by the failure to <br />meet a milestone shall not unreasonably withhold agreement to such an amendment <br />unless: <br />12 <br /> <br />223 <br />