SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Table 2.1.Interconnection Application Process Fee <br />Equipment Type Process Fee <br />Certified System $100 + $1/kW <br />Non-Certified System $100 + $2/kW <br /> <br />2.4.Battery Storage <br />An inverter-based DER system may include battery storage. DER systems that include <br />battery storage should complete the Energy Storage Application along with the <br />Interconnection Application. <br /> <br />2.5.Site Control <br />Documentation of site control must be submitted with the Interconnection Application. <br />Site control may be demonstrated by any of the following: <br />Ownership of, a leasehold interest in, or a right to develop a site for the purpose of <br />constructing the DER system. <br /> <br />An option to purchase or acquire a leasehold site for constructing the DER system. <br /> <br />An exclusivity or other business relationship between the Interconnection <br />Customer and the entity having the right to sell, lease, or grant the <br />Interconnection Customer the right to possess or occupy a site for constructing the <br />DER system. <br /> <br />3Application Review <br />3.1.Timelines <br />The Interconnection Application shall be date- and time-stamped upon initial, and if <br />necessary, resubmission receipt. The Interconnection Customer shall be notified of <br />receipt by the Area EPS Operator within ten (10) Business Days of receipt of the <br />Interconnection Application. <br /> <br />The Area EPS Operator shall notify the Interconnection Customer if the Interconnection <br />Application is deemed incomplete within ten (10) Business Days and provide a written <br />list detailing all information that must be provided to complete the Interconnection <br />Application. The Interconnection Customer has ten (10) Business Days to provide the <br />missing information unless additional time is requested with valid reasons. Failure to <br />submit the requested information within the stated timeline will result in the <br />Interconnection Application being deemed withdrawn. The Area EPS Operator has an <br />3 <br /> <br />192 <br />