My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />2Application Submission <br />2.1.Fast Track Process Application <br />The Interconnection Customer shall complete the Standard Interconnection Application <br />and submit it to the Area EPS Operator to initialize the Interconnection Process. A <br />completed Interconnection Application will include the following: <br /> <br />A completed Interconnection Application signed by the Interconnection <br />Customer. <br /> <br />A non-refundable processing fee indicated in Section 2.3. <br /> <br />A site layout drawing of the proposed DER system. <br /> <br />A one-line diagram of the proposed DER system showing the point of common <br />Distribution System. <br /> <br />All equipment manufacturer specification sheets. <br /> <br />Documentation of site control indicated in Section 2.5. <br /> <br />2.2.Professional Licensed Engineer Signature <br />The one-line diagram submitted with the Interconnection Application will require a <br />signature from a professional engineer licensed in the State of Minnesota certifying the <br />DER was designed in conformance to the Minnesota Technical Requirements for the <br />following conditions: <br /> <br />4 <br />Certified equipment is greater than 250 kW. <br /> <br />Non-certified equipment is greater than 20 kW. <br /> <br />2.3.Processing Fee <br />The processing fee will differ for a Fast Track Interconnection Application depending on <br />the type of equipment utilized as seen in Table 2.1. <br /> <br /> <br />4 <br />Additional information regarding certified equipment is found in Section 14 and Section 15 of the Process <br />Overview document. <br />2 <br /> <br />191 <br />
The URL can be used to link to this page
Your browser does not support the video tag.