My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />twenty-one (21) Business Days of receipt, or as otherwise stated in the Uniform <br />Contract. <br /> <br />The Area EPS Operator does not give any warranty, expressed or implied, as to the <br />adequacy, safety, or other characteristics of any structures, equipment, wires, <br />appliances or devices owned, operated, installed or maintained by the Interconnection <br />Customer, including without limitation the DER and any structures, equipment, wires, <br />appliances or devices not owned, operated or maintained by the Area EPS Operator. <br /> <br />8.5.Authorization for Parallel Operation <br />The Interconnection Customer shall not operate its DER system in parallel with the <br />Area EPDistribution System without prior written authorization from the <br />Area EPS Operator. The Area EPS Operator shall provide such authorization within <br />three (3) Business Days from when the Area EPS Operator receives the Certificate of <br />Completion and notification the Interconnection Customer has complied with all <br />applicable parallel operations requirements. Such authorization shall not be <br />unreasonably withheld, conditioned or delayed. <br /> <br />8.6.Continual Compliance <br />The Interconnection Customer shall be fully responsible for operating, maintaining, and <br />repairing the DER as required to ensure that it complies at all times with the <br />interconnection standards to which it has been certified. The Interconnection <br />Customer shall also operate its DER system in <br />technical requirements as referred to in the executed Uniform Contract or MMIA. The <br />Area EPS Operator may periodically inspect, at its own expense, the operation of DER <br />system as it relates to power quality, thermal limits and reliability. Failure by the <br />Interconnection Customer to remain in compliance with the technical requirements will <br />result in the DER system disconnection Distribution <br />System. <br /> <br />8.7.Disconnection of DER <br />The Area EPS Operator has the right to disconnect the DER in the event the <br />Interconnection Customer: <br />Does not continue to follow and maintain IEEE 1547 settings approved by the Area <br />EPS Operator as indicated by the adopted technical requirements. <br /> <br />Does not meet all the requirements of the Simplified Process. <br /> <br />10 <br /> <br />185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.