SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />twenty-one (21) Business Days of receipt, or as otherwise stated in the Uniform <br />Contract. <br /> <br />The Area EPS Operator does not give any warranty, expressed or implied, as to the <br />adequacy, safety, or other characteristics of any structures, equipment, wires, <br />appliances or devices owned, operated, installed or maintained by the Interconnection <br />Customer, including without limitation the DER and any structures, equipment, wires, <br />appliances or devices not owned, operated or maintained by the Area EPS Operator. <br /> <br />8.5.Authorization for Parallel Operation <br />The Interconnection Customer shall not operate its DER system in parallel with the <br />Area EPDistribution System without prior written authorization from the <br />Area EPS Operator. The Area EPS Operator shall provide such authorization within <br />three (3) Business Days from when the Area EPS Operator receives the Certificate of <br />Completion and notification the Interconnection Customer has complied with all <br />applicable parallel operations requirements. Such authorization shall not be <br />unreasonably withheld, conditioned or delayed. <br /> <br />8.6.Continual Compliance <br />The Interconnection Customer shall be fully responsible for operating, maintaining, and <br />repairing the DER as required to ensure that it complies at all times with the <br />interconnection standards to which it has been certified. The Interconnection <br />Customer shall also operate its DER system in <br />technical requirements as referred to in the executed Uniform Contract or MMIA. The <br />Area EPS Operator may periodically inspect, at its own expense, the operation of DER <br />system as it relates to power quality, thermal limits and reliability. Failure by the <br />Interconnection Customer to remain in compliance with the technical requirements will <br />result in the DER system disconnection Distribution <br />System. <br /> <br />8.7.Disconnection of DER <br />The Area EPS Operator has the right to disconnect the DER in the event the <br />Interconnection Customer: <br />Does not continue to follow and maintain IEEE 1547 settings approved by the Area <br />EPS Operator as indicated by the adopted technical requirements. <br /> <br />Does not meet all the requirements of the Simplified Process. <br /> <br />10 <br /> <br />185 <br />