My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />equipment shall be performed pursuant to applicable codes and standards of <br />The Interconnection Customer shall provide the <br />Area EPS Operator with a Certificate of Completion after completion of the DER <br />installation. <br /> <br />Prior to parallel operation, the Area EPS Operator may inspect the DER for compliance <br />with standards, which may include a witness test, and schedule appropriate metering <br />replacements, if necessary. The Area EPS Operator shall send qualified personnel to the <br />DER site to inspect the interconnection and witness the testing but bears no liability for <br />the results of the test. <br /> <br />The Area EPS Operator is obligated to complete the witness test, if required, within ten <br />(10) Business Days of receipt of the Certification of Completion. If the Area EPS <br />Operator does not inspect within ten (10) Business Days, the witness test is deemed <br />waived unless upon mutual agreement of both Parties to extend the timeline for the <br />witness test. <br /> <br />Within three (3) Business Days of satisfactory inspection or waiver of inspection, the <br />Area EPS Operator shall provide the Interconnection Customer written <br />acknowledgment that the DER has permission to operate. Such written <br />acknowledgment shall not be deemed to be or construed as any representation, <br />assurance, guarantee, or warranty by the Area EPS Operator of the safety, durability, <br />suitability, or reliability of the DER or any associated control, protective, and safety <br />devices owned or controlled by the Interconnection Customer or the quality of power <br />produced by the DER. <br /> <br />If the witness test is not satisfactory, the Area EPS Operator has the right to disconnect <br />the DER. The Interconnection Customer has no right to operate in parallel, except for <br />optional testing not to exceed two hours, until permission to operate is granted by the <br />Area EPS Operator. <br /> <br />8.4.Interconnection Costs <br />The Interconnection Customer shall pay for the actual cost of the Interconnection <br />Facilities and Distribution Upgrades <br />commission the proposed DER system. An estimate of the interconnection costs shall <br />be stated in the Uniform Contract or MMIA. The Area EPS Operator shall render the <br />final interconnection cost invoice to the Interconnection Customer within thirty (30) <br />Business Days after the proposed DER system has been commissioned by the Area EPS <br />Operator, or upon the commissioning being waived by the Area EPS Operator. The <br />Interconnection Customer shall make payment to the Area EPS Operator within <br />9 <br /> <br />184 <br />