Laserfiche WebLink
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> <br />2.3.Site Control <br />By signing the Simplified Interconnection Application, the Interconnection Customer is <br />indicating that the proposed DER system is being located where the Interconnection <br />Customer has site control. Site control includes ownership of, a leasehold interest in, or <br />a right to develop a site for the purpose of construction of a DER. Additional <br />information regarding Site Control can be reviewed in the Process Overview document <br />in Section 4.8. <br /> <br />3Application Review <br />3.1.Timelines <br />The Interconnection Application shall be date- and time-stamped upon initial, and if <br />necessary, resubmission receipt. The Interconnection Customer shall be notified of <br />receipt by the Area EPS Operator within ten (10) Business Days of receipt of the <br />Interconnection Application. <br /> <br />The Area EPS Operator shall notify the Interconnection Customer if the Interconnection <br />Application is deemed incomplete within ten (10) Business Days and provide a written <br />list detailing all information that must be provided to complete the Interconnection <br />Application. The Interconnection Customer has five (5) Business Days to provide the <br />missing information unless additional time is requested with valid reasons. Failure to <br />submit the requested information within the stated timeline will deem the <br />Interconnection Application withdrawn. The Area EPS Operator has an additional five <br />(5) Business Days to review the additionally provided information for completeness. <br /> <br />An Interconnection Application will be deemed complete upon submission to the Area <br />EPS Operator provided all documents, fees and information required with the <br />Interconnection Application adhering to Minnesota Technical Requirements is <br />included. The time- and date- stamp of the completed Interconnection Application shall <br />be accepted as the qualifying date for the purpose of establishing a queue position as <br />described in Section 4.7 of the Overview Process document. <br /> <br />The Area EPS Operator has a total of twenty (20) Business Days to complete the <br />Interconnection Application review from the receipt of a completed Interconnection <br />Application and submit notice back to the Interconnection Customer stating the <br />proposed DER system may proceed with the interconnection process or the proposed <br />DER system has been moved into a different process track. The time during which the <br />Interconnection Customer provides missing information is not included in the Area EPS <br /> <br /> <br />2 <br /> <br />177 <br />