My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />1Applicability <br />1.1.Capacity Limit <br />The Simplified Process only is applicable to certified inverter-based Distributed Energy <br />Resource (DER) systems with the capacity of 20 kW AC or less. The capacity is <br />determined by the aggregated summation of the Nameplate Rating of the inverters <br />that make up the DER system. Additional information regarding the capacity limits can <br />be seen in Section 6 of the Process Overview document. <br /> <br />1.2.Certified Inverters <br />A certified inverter will have certification of meeting the current version of the IEEE <br />standard 1547. A common inverter certification is UL 1741. Note that certified inverters <br />may still need to have a setting adjusted to meet the technical requirements of the <br />Area EPS Operator. Additional information regarding certified equipment is found in <br />Section 14 and Section 15 of the Process Overview document. <br /> <br />2Application Submission <br />2.1.Simplified Process Application <br />The Interconnection Customer shall complete the Simplified Interconnection <br />Application and submit it to the Area EPS Operator to initialize the Interconnection <br />Process. A completed Simplified Interconnection Application will include the following: <br /> <br />A completed Simplified Interconnection Application signed by the <br />Interconnection Customer, <br /> <br />A non-refundable processing fee of $100, <br /> <br />An aerial site layout drawing of the proposed DER system, <br /> <br />A one-line diagram of the proposed DER system showing the point of common <br />coupling, PCC, Distribution System, and <br /> <br />All certified equipment manufacturer specification sheets. <br /> <br />2.2.Battery Storage <br />An inverter-based DER system may include battery storage. DER systems that include <br />battery storage must also complete the Energy Storage Application with the Simplified <br />Interconnection Application. <br />1 <br /> <br />176 <br />
The URL can be used to link to this page
Your browser does not support the video tag.