My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />limited capacity. unreasonably <br />withheld provided proper documentation is provided showing the effective limit active <br />power output will not adversely affect the safety and reliability of the Area EPS <br />Interconnection Application must be withdrawn or revised to specify the maximum <br />capacity that the DER system is capab <br />distribution system without such limitations. Nothing in this section shall prevent the <br />Area EPS Operator from considering a higher output, (i.e. aggregate Nameplate Rating), <br />if the limitations do not provide adequate assurance, when evaluating the system <br />impacts. <br /> <br />7Modification to Interconnection Applications <br />7.1.Procedures <br />At any time after the Interconnection Application is deemed complete, the <br />Interconnection Customer or the Area EPS Operator may identify modifications to the <br />proposed DER system that may improve costs and benefits (including reliability) of the <br />proposed DER system and the ability for the Area EPS Operator to accommodate the <br />proposed DER system. The Interconnection Customer shall submit to the Area EPS <br />Operator in writing all proposed modifications to any information provided in the <br />Interconnection Application. The Area EPS Operator cannot unilaterally modify the <br />Interconnection Application. <br /> <br />Additional information regarding modifications to interconnection applications is found <br />in each process track document. <br /> <br />8Interconnection Agreements <br />8.1.Timelines <br />After the Interconnection Application has been approved by the Area EPS Operator, the <br />Area EPS Operator shall provide the Interconnection Customer with an executable <br />Interconnection Agreement within five (5) Business Days. The Interconnection <br />Customer shall have thirty (30) Business Days to sign and return the Interconnection <br />Agreement to the Area EPS Operator. The Area EPS Operator shall sign the <br />Interconnection Agreement within five (5) business days after receiving the signed <br />Interconnection Agreement from the Interconnection Customer. <br /> <br />If the Interconnection Customer fails to return a signed Interconnection Agreement to <br />the Area EPS Operator within thirty (30) Business Days and fails to request an extension <br />as explained in Section 10, the Interconnection Application will be deemed withdrawn. <br />12 <br /> <br />156 <br />
The URL can be used to link to this page
Your browser does not support the video tag.