My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 12-17-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
12-17-2019 SPECIAL
>
4.1. ERMUSR 12-17-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2019 3:57:01 PM
Creation date
12/19/2019 3:40:14 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/17/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />1Key Terminology <br />1.1.Distributed Energy Resource <br />Distributed Energy Resources, DER, were often referred to in past interconnection <br />processes as Distributed Generation, DG, and on occasion also interchanged with the <br />term Qualifying Facility, QF. This Interconnection Process uses the term DER to address <br />all types of generation and energy resources that can be interconnected to the electric <br />Distribution System. DER technologies can include photovoltaic solar systems, wind <br />turbines, storage batteries or diesel generators and are not limited to renewable types <br />of technologies. <br /> <br />1.2.Point of Common Coupling (PCC) / Point of DER Connection (POC) <br />The meter is normally the point of demarcation between the utility-owned equipment <br />and the customer-owned equipment. The term Point of Common Coupling, PCC, is the <br />demarcation location between the utility and the customer. <br /> <br />The Point of DER Connection, PoC, can be different from the PCC. The PoC is the <br />location where a DER system would interconnect to the electrical system normally <br />owned by the customer. For example, the PoC for a rooftop photovoltaic solar system <br />may be <br /> <br />1.3.Capacity <br />Throughout the Interconnection Process will be references to the capacity of the DER <br />system. In most cases, the capacity listed is referring to the Nameplate Capacity of the <br />DER system. All capacity references will be in alternating current, AC. <br /> <br />There can be multiple DER systems with different PoCs that all have the same PCC <br />submitted on a single interconnection application. The capacity for this type of <br />interconnection would be the aggregate Nameplate Capacity of all DER systems at the <br />individual PoCs. Additional examples of DER system arrangements can be seen in <br />Section 13 under the definition of Point of Common Coupling. <br /> <br />2Roles <br />2.1.Overview <br />During the interconnection process for a proposed DER system, there may be multiple <br />entities involved in the application, approval and commissioning processes. The main <br />entities that are involved during the Interconnection Process for a proposed DER <br />system are the Interconnection Customer, the Application Agent and the DER <br />2 <br /> <br />146 <br />
The URL can be used to link to this page
Your browser does not support the video tag.