SCHEDULE 3 - DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br />Foreword <br />The State of Minnesota currently has interconnection process standards in effect to address the <br />interconnection of distributed energy resources (DER) to the distribution grid. Under Minnesota <br />Statute §216B.1611, cooperatives and municipals shall adopt an interconnection process that <br />addresses the same issues as the interconnection process approved by the Minnesota Public <br />Utilities Commission. The Elk River Municipal Utilities Distributed Energy Resources <br />Interconnection Process (Interconnection Process) applies to any DER no larger than 10- <br />megawatts (MW) AC interconnecting to and operating in parallel with Elk River Municipal <br /> distribution system in Minnesota. This interconnection process document is designed <br />to be customer-centric when explaining the steps and details to interconnect DER systems to <br />the distribution grid. <br /> <br />The Interconnection Process is comprised of four manuals: 1) Process Overview, 2) Simplified <br />Process, 3) Fast Track Process, and 4) Study Process and also contains several forms, including a <br />final Interconnection Agreement. For the majority of DER interconnections, only the Process <br />Overview and the Simplified Process manuals will apply. For larger and more complex DER <br />interconnections, the Fast Track Process or the Study Process may apply. <br /> <br />As part of the Interconnection Process, an Interconnection Agreement is to be executed prior to <br />interconnecting a DER system to the utility distribution grid. For most DER interconnections, the <br />Contract for Cogeneration and Small Power Production Facilities (Uniform Contract) will <br />be used. For DER systems that do not fall under the terms of the Uniform Contract, the <br />Municipal Minnesota Interconnection Agreement (MMIA) will apply. <br /> <br />The process to interconnect a DER system to the distribution grid starts with the submission of <br />an Interconnection Application. Each track has different information that is requested in the <br />application and the non-refundable interconnection application fees will vary. Both the electric <br />utility and the interconnecting customer have timelines that are enforced to ensure a timely <br />application review, contract execution and interconnection commissioning. <br /> <br />The key to a successful interconnection of a DER system is communication between all parties. <br />Timely submission of the Interconnection Application prior to the purchase and installation of a <br />DER system is strongly recommended. The Utility encourages customers to ask questions <br />throughout the interconnection process. Interconnecting DER system to the distribution grid is <br />not an effortless process, but it does not need to be a problematic process either. <br />1 <br /> <br />145 <br />