My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.2. SR 12-16-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
12-16-2019
>
9.2. SR 12-16-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:15:17 PM
Creation date
12/13/2019 9:48:59 AM
Metadata
Fields
Template:
City Government
type
SR
date
12/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Further detail grades on the grass pave area and the entrance to it from the paved drive <br /> lane. <br /> Additional spot elevations for the Grasspave areas will be included in the construction documents for both <br /> projects. Curb and gutter in these areas is proposed to be surmountable(MnDOT D412). <br /> Full grading plans (with contours) are required. <br /> 9. Need to reestablish the capacity and functionality of the existing storm water pondbelow <br /> bluff. It seems the proposed access drive is conflicting in location. <br /> The existing stormwaterpond below the bluff will be expanded and redesigned to meet the City s current <br /> stormwater requirements The proposed access drive has been removed. <br /> Complete <br /> 10. Detail the design of the retaining walls along south side of project. <br /> The proposed landscape retaining walls(less than 4'high)will be design-build and will be included in the <br /> construction documents phase. <br /> Full grading plans (including construction details) are required. <br /> 11. Submit full updated civil/site plans for the proposed 4-story apartment building. <br /> The preliminary plans have been revised to show the Riverwalk Apartments site along with the River Pla.Za <br /> (Saxon Apartments)site. Construction documents for both projects will be submitted separately after PUD <br /> approval. <br /> Updates required. <br /> 12. Show all proposed grades in dark solid lines. <br /> Proposed spot elevations andpond contours are shown in dark solid liner. <br /> Full grading plans (with contours) are required. <br /> 13. Additional comments will be provided upon receipt of referenced plans and changes. <br /> So noted <br /> 14. Staff reserves the right to continue review of all site,grading and utility plans. <br /> So noted <br /> Stormwater: <br /> 1. Stormwater management requirements need to be met as listed in Ordinance Sec.78-503. <br /> - Stormwater and urban runoff control. and Sec. 78-504. - Post construction <br /> stormwater management for proposed impervious surfaces. http://mn-\ <br /> elkriver.civicplus.com/Document Center/View/3180. <br /> Thepreliminaryplans and stormwater analysis, design and report have been revised to meet the current <br /> stormwater management requirements.Additional stormwater information(AADS results, storm sewer suing <br /> calculations, etc.)will be included in the construction documents phase. <br /> Complete stormwater plans have not been submitted for review.The review will be completed <br /> once the all pertinent documents have been received. <br />
The URL can be used to link to this page
Your browser does not support the video tag.