Laserfiche WebLink
8. Further detail grades on the grass pave area and the entrance to it from the paved drive <br /> lane. <br /> Additional spot elevations for the Grasspave areas will be included in the construction documents for both <br /> projects. Curb and gutter in these areas is proposed to be surmountable(MnDOT D412). <br /> Full grading plans (with contours) are required. <br /> 9. Need to reestablish the capacity and functionality of the existing storm water pondbelow <br /> bluff. It seems the proposed access drive is conflicting in location. <br /> The existing stormwaterpond below the bluff will be expanded and redesigned to meet the City s current <br /> stormwater requirements The proposed access drive has been removed. <br /> Complete <br /> 10. Detail the design of the retaining walls along south side of project. <br /> The proposed landscape retaining walls(less than 4'high)will be design-build and will be included in the <br /> construction documents phase. <br /> Full grading plans (including construction details) are required. <br /> 11. Submit full updated civil/site plans for the proposed 4-story apartment building. <br /> The preliminary plans have been revised to show the Riverwalk Apartments site along with the River Pla.Za <br /> (Saxon Apartments)site. Construction documents for both projects will be submitted separately after PUD <br /> approval. <br /> Updates required. <br /> 12. Show all proposed grades in dark solid lines. <br /> Proposed spot elevations andpond contours are shown in dark solid liner. <br /> Full grading plans (with contours) are required. <br /> 13. Additional comments will be provided upon receipt of referenced plans and changes. <br /> So noted <br /> 14. Staff reserves the right to continue review of all site,grading and utility plans. <br /> So noted <br /> Stormwater: <br /> 1. Stormwater management requirements need to be met as listed in Ordinance Sec.78-503. <br /> - Stormwater and urban runoff control. and Sec. 78-504. - Post construction <br /> stormwater management for proposed impervious surfaces. http://mn-\ <br /> elkriver.civicplus.com/Document Center/View/3180. <br /> Thepreliminaryplans and stormwater analysis, design and report have been revised to meet the current <br /> stormwater management requirements.Additional stormwater information(AADS results, storm sewer suing <br /> calculations, etc.)will be included in the construction documents phase. <br /> Complete stormwater plans have not been submitted for review.The review will be completed <br /> once the all pertinent documents have been received. <br />