Laserfiche WebLink
Public Works: <br /> 1. Identify all existing utilities and corresponding drainage easements on an updated survey <br /> that includes the lot lines shown on the updated plans. <br /> This information was included on the on Certi icate of Surpy and is shown on the Preliminary Plat. <br /> Plat documents continue to show existing easements running beneath proposed buildings <br /> and revised stormwater plans outside of existing easements.Update plans to satisfy the <br /> requirement. <br /> 2. A formal agreement for the proposed shared storm sewer system between the two <br /> properties must be formalized in an easement and agreement. <br /> A formal storm sewer system agreement with easements between the two properties will be completed during the <br /> construction documents phase. <br /> Comment may be satisfied through condition of approval,prior to recording of the final plat. <br /> 3. Proposed lot lines must have standard drainage and utility easements dedicated. <br /> Standard drainage and utility easements along the proposed lot lines are included in the preliminary and final <br /> plats. <br /> Easements are not shown on the preliminary or final plat. <br /> 4. Parking bump-outs are not permitted on the public roadway in front of the proposed 4- <br /> story apartment building. <br /> According to City Code Sec 74-95—Angle and parallel parking:Angle parking may be permitted on <br /> any street by ordinance of the council. On any such street, every vehicle parked shall be parked with the <br /> front of the vehicle facing the curb or the edge of the traveled portion of the street at an an of <br /> approximately 45 degrees. On all other streets, cars shall be parked parallel to the curb or edge of the <br /> roadway in accordance with law. <br /> These parallel parking stalls are requested as part of the PUD. <br /> The request must be approved by the City Council. <br /> 5. Sewer service shown off the north end of the 4-story apartment addition building extends off <br /> of the proposed lot. All services (sewer and water) must remain within their own lot and <br /> connect to the public system in the roadway adjacent to said lot. <br /> The existing sanitary sewer service as shown of the north end of the Saxon building was for the connection when it <br /> had a septic system. During the construction documents phase, it will be determined if this sanitary service is still <br /> necessary. Pit is, a new sanitary sewer will be installed within the proposed River Pla.Za lot. <br /> Plans need to be updated to include all proposed service lines. <br /> 6. Submit grading plans for the new 4-story apartment site. <br /> The preliminary grading plan has been revised to show spot elevations on the Riverwalk Apartments site. <br /> Additional spot elevations,pro <br /> osedgrades and contours will be included in the construction documents for both <br /> projects. <br /> Full grading plans are required. <br /> 7. Proposed contours must be shown in all areas. <br /> Additional pot elevations,pm <br /> posedgrades and contours will be included in the construction documents <br /> for both projects. <br /> Full grading plans are required. <br />