My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5. SR 11-04-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
11-04-2019
>
4.5. SR 11-04-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2019 4:08:40 PM
Creation date
10/31/2019 4:07:30 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/4/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Approach | 9A Proposal for Lake Orono Restoration and Enhancement (LORE) for the City of Elk River <br />Construction Services <br />Post Construction Services <br />CONDITIONS SURVEY <br />Following final construction, our team will complete a post construction record drawing of all design features <br />constructed in accordance with the final design and specifications. This will be accomplished using a combination <br />of drone technology and survey staff. Our staff will use the field data collected to develop a final record of lake <br />bottom and habitat features of the project. <br />WSB has provided an estimate for construction <br />observation, survey, and inspection based on a <br />14-week project construction schedule. The estimate <br />enclosed is based on our current understanding of <br />the project scope and timeline for construction. In <br />regard to construction observation and inspection, <br />it anticipates using a combination of on-site shadow <br />inspection and remote cameras that will be installed <br />to continuously record and allow observation to be <br />completed from off-site locations. We will complete a <br />post-project drone survey when the lake is still drawn- <br />down to determine quantities. <br />The scope provided could change based on changes <br />to the scope of the project, the number of construction <br />days needed, and the weather conditions that would <br />allow the contractor to complete the excavation <br />necessary over the winter months of 2020 into 2021. <br />This scope also anticipates that the full restoration <br />would be completed in 2021. <br />We are experts in dealing with unforeseen <br />conditions and will work to reduce risk to <br />the City and minimize adverse impacts to <br />the project budget and residents. <br />WSB will work closely with City staff to ensure that the <br />restoration techniques used during construction follow <br />standard operating procedures and provide adequate <br />warranty and maintenance provisions to ensure that <br />the TAP, residents, and Council get what they desire <br />from the project. <br />Construction Services tasks will include survey, quantities <br />tabulation, quantity recommendation for payments to the <br />contractor, and tracking of quantities. Our team will be <br />available to make necessary adjustments to meet all of <br />the audit/filing procedures of the City.
The URL can be used to link to this page
Your browser does not support the video tag.