My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 10-07-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
10-07-2019
>
8.1. SR 10-07-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 3:03:32 PM
Creation date
10/4/2019 9:59:07 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/7/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER REQUEST <br />City of Elk RiverTo : PCO: <br />From: Tim Ryan <br />PH: 952-232-6297 <br />Email: tim.ryan@rjmconstruction.com <br />Date: <br />Project: Elk River Multi-Purpose Facility and Lion John Weicht Park <br />09/26/2019Description:PR#2 Lease Space <br />Owner-8 <br />13065 Orono Parkway <br />Elk River, MN 55330 <br />830 Boone Ave <br />Golden Valley, MN 55427 <br />MINNEAPOLIS OFFICE <br />Details: <br />Cost to furnish and install all material, labor and equipment to provide new proposed lease shell space per PR#2 construction documents. <br />Item Subcontractor:Phase: <br /> 2,001.6001-10-05-General Conditions <br />24 hours of project engineer time to implement changes per PR <br />#2 including submittal management, solicitation, review, and <br />issuance of pricing. <br />1 <br /> 33,996.00Crosstown Masonry, Inc.04-21-05-Concrete/Masonry <br />PR#2 Lease Space: Includes labor and material to provide <br />concrete and masonry systems scope of work per drawings and <br />specifications. <br />2 <br /> 18,117.98Distinctive Iron, LLC 05-12-05-Structural Steel <br />PR#2 Lease Space: Furnish and deliver new steel beams and <br />columns per drawings and specifications. Includes tax. <br />3 <br /> 4,190.00High Five Erectors II, Inc 05-12-10-Structural Steel Erection <br />PR#2 Lease Space: Provide labor and materials to unload and <br />install new steel columns and beams per drawings and <br />specifications. <br />4 <br /> 2,060.00Top-All Roofing, Inc.07-53-05-Roofing <br />PR#2 Lease Space: Furnish all labor and materials to provide a <br />complete and functioning roofing assembly per drawings and <br />specifications. <br />5 <br /> 43,100.00Murphy Window and Door Commercial Inc 08-81-05-Glass and Glazing <br />PR#2 Lease Space: Provide labor and materials to furnish and <br />install a complete and functioning storefront system including all <br />doors, hardware and glazing per drawings and specifications. <br />6 <br /> 23,308.52RTL Construction, Inc.09-29-05-Gypsum <br />PR#2 Lease Space: Provide labor and materials to provide new <br />metal stud framed gypsum wall assembly per drawing details <br />and specifications. Includes $13,500 to box out all steel <br />columns and beams to required 2-hour fire rating with insulation <br />and level 4 finish in lieu of intumescent paint. <br />7 <br /> 4,000.0009-91-05-Painting <br />Allowance for painting new gypsum board walls in hallway, and <br />new HM frame and door at lease space. <br />8 <br /> 11,955.00Summit Companies 21-10-05-Fire Protection <br />PR#2 Lease Space: Provide labor and materials to furnish and <br />install a complete and functioning sprinkler protection system <br />within new lease space per drawings, specifications and codes. <br />9 <br />19520-0033 <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.