My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.1. DRAFT PC MINUTES 09-24-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2019
>
09-24-2019
>
3.1. DRAFT PC MINUTES 09-24-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2019 10:51:28 AM
Creation date
9/19/2019 10:51:28 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Page 2 <br />August 27, 2019 <br />----------------------------- <br />Commissioner Rydberg asked if the applicant had expressed any objection to the <br />conditions outlined in the staff report. <br /> <br />Mr. Carlton stated he spoke to the applicant before the meeting and indicated he had <br />no objections to the conditions as proposed. <br /> <br />Chair Johnson opened the public hearing. There being no one to speak, Chair <br />Johnson closed the public hearing. <br /> <br />Moved by Commissioner Thiel and seconded by Commissioner Rydberg to <br />recommend approval of the amendment to the Conditional Use Permit for <br />Auto-Rec Bodyworks Inc. to allow for construction of an accessory structure <br />with the following conditions to satisfy the standards set forth in Section 30- <br />654: <br /> <br />1. Variance (V 19-07) shall be approved. <br />2. The approved Conditional Use Permit (CU 16-09) will become void. <br />3. The property cannot be used for residential dwelling purposes. <br />4. The building shall meet all building and fire codes. <br />5. The building shall be inspected by the city’s Building Official and Fire <br /> Marshal to verify compliance with all building and fire codes and all <br /> identified violations must be addressed prior to issuance of any new <br /> building permit for the property. <br />6. All septic systems must provide a certificate of compliance or notice of <br /> noncompliance, for the existing septic system, and must be signed by <br /> a licensed inspection business or by a qualified employee certified as <br /> an inspector who is authorized by the local unit of government. The <br /> certificate of compliance or notice of noncompliance must be <br /> submitted to the local unit of government no later than 15 days after <br /> any compliance inspection. <br />7. All vehicles stored on the premises shall be stored within an area <br /> which is screened by a 6 (six) foot high 100% opaque fence. <br />8. There shall be no repair or maintenance of vehicles outside of the <br /> building. <br />9. Car, truck, RV, and marine sales shall not be allowed. <br /> <br />Motion carried 4-0. <br /> <br />5. General Business <br /> <br /> There was no general business. <br /> <br />6.1 Council Liaison Update <br /> <br />Commissioner Rydberg will attend the September 16 City Council meeting as <br />Planning Commission representative. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.