My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 09-10-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
09-10-2019
>
4.1. ERMUSR 09-10-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 4:24:53 PM
Creation date
9/6/2019 4:24:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3: Power Quality. Operation of Customer's load disconnect equipment <br /> must not cause any reduction in the quality of service provided by ERMU to its other <br /> customers nor interfere with the operation of the Distribution System or ERMU's <br /> power supplier's transmission system. If, in the opinion of ERMU, quality of service <br /> to other customers is compromised, it shall be the responsibility of Customer to take <br /> any corrective action that may be required and/or for reimbursing ERMU for the cost <br /> of corrective action which ERMU deems necessary to provide and restore service to <br /> prescribed limits. Operation of Customer's load disconnect equipment shall be made <br /> in a manner such that Total Harmonic Distortion (THD) levels shall be less than 1% <br /> and power factor of 95% lagging or higher is maintained. <br /> ARTICLE 5. LOAD DISCONNECT OPERATION Upon not less than thirty minutes <br /> notice by ERMU or its designated agent, Customer shall interrupt enough load to attain the <br /> PDL as stated in Article 1. During such period ERMU shall not be obligated to serve that <br /> portion of the load interrupted to reach the PDL. Exceptions to the thirty minute notice may <br /> occur in system emergency situations, but every attempt will be made to give as much <br /> advance notice as possible under system emergency situations. <br /> ARTICLE 6. COMPENSATION TO CUSTOMER. <br /> Section 1: ERMU shall compensate Customer for load interruptions maintained at <br /> or below the PDL when requested by ERMU or its designated agent, at the rates <br /> indicated below: <br /> Monthly Credit/Kw* <br /> Summer (June, July, and Aug) $14.00 per kW <br /> Winter(Dec, Jan, and Feb) $10.00 per kW <br /> Spring/Fall (Mar, Apr, May, Sept, Oct,Nov $ 6.00 per kW <br /> *Credit applies only during months in which Customer coincidental peak <br /> demand is at least 100 kW over the PDL. <br /> The difference between Customer's coincidental peak demand at the time of notice to <br /> interrupt and the PDL shall be used as a basis for establishing Customer's monthly <br /> credit. In months in which no notice to interrupt is given, the difference between <br /> Customer's coincidental peak demand and the PDL shall be used as a basis for <br /> establishing Customer's monthly credit. <br /> In any month in which the difference between the Customer's coincidental peak <br /> demand and the PDL is not at least 100 kW, no credit will be given. If the difference <br /> between the Customer's coincidental peak demand and the PDL remains less than <br /> 100 kW for two or more consecutive months, a new PDL may be established or <br /> ERMU shall have the right to terminate this Agreement as indicated in Article 12. <br /> Exceptions to the right to terminate will be made for seasonal loads, but that <br /> exception must be noted as defined under Seasonal Loads in Article 1. <br /> If Customer fails to interrupt load down to the PDL for the specified length of time of <br /> the control period in any calendar month a$5.00/kW demand penalty may be added <br /> 3 <br /> 128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.