My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. ERMUSR 09-10-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
09-10-2019
>
4.1. ERMUSR 09-10-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2019 4:24:53 PM
Creation date
9/6/2019 4:24:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Summer means the period from June 1 through August 31. <br /> Utility means Elk River Municipal Utilities <br /> Winter means the period from December 1 through February 28 or 29. <br /> ARTICLE 2. TERM. This Agreement shall begin at 12:01 a.m. on April 1st, 2012 and <br /> shall continue until termination as provided for in Article 12. <br /> ARTICLE 3. LOAD INTERRUPT AVAILABILITY. For the Willi of this Agreement, <br /> Customer represents and warrants that interruptible load of at least 100 kW shall be available <br /> for interruption upon request by ERMU or its designated agent. Duration and frequency of <br /> interruptions are subject to the limitations set forth in Article 7. <br /> ARTICLE 4. SAFETY AND OPERATING STANDARDS. Safety and Operating <br /> Standards under which ERMU operates are imposed to protect ERMU employees and the <br /> general public, and are intended to guarantee a quality of service to all customers. Customer <br /> must operate in a manner that insures the safety of ERMU employees and the general public. <br /> Operation of Customer load disconnect equipment must allow electric service to other <br /> customers to remain within prescribed limits. <br /> Section 1: Inspection. An inspection certificate issued by the state electrical <br /> inspector is required for wiring changes made by Customer for participation in this <br /> Agreement. All changes must comply with the IEEE,the National Electrical Code, <br /> National Electric Safety Code, and applicable local codes. An inspection by ERMU <br /> personnel is also required prior to finalizing this Agreement. All Federal, State, and <br /> local safety codes pertaining to installation, operation, and maintenance of Customer- <br /> owned load disconnect and collateral equipment shall be followed and are the <br /> responsibility of Customer. <br /> Section 2: Safety Equipment. Each manufacturer has specific methodologies <br /> and equipment to assure safe operation of load disconnect equipment. Either of <br /> the following methods are an acceptable means for interrupting Customer load <br /> from the Distribution System. <br /> Automatic Load Disconnect. Customer's equipment may be designed to <br /> automatically disconnect or shut down all or a portion of the Customer's load <br /> when requested to do so by ERMU or its designated agent. Auto reconnect to <br /> the utility source shall be designed to restore Customer load in increments not to <br /> exceed 25 kW spaced at least 15 seconds apart. <br /> Manual Disconnect. A means shall be available to manually disconnect or <br /> shut down all or a portion of the Customer's load when requested to do so by <br /> ERMU or its designated agent. Manual reconnect to the utility source shall be <br /> made in increments not to exceed 25 kW spaced at least 15 seconds apart. <br /> 2 <br /> 127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.