My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.3. ERMUSR 09-10-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
09-10-2019
>
2.3. ERMUSR 09-10-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 3:06:13 PM
Creation date
9/6/2019 4:15:26 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PILOT to the City. By conducting the FleetCarma Suitability Assessment, ERMU and the City of <br /> Elk River will be able to provide meaningful, measured results that will determine if <br /> incorporating electric vehicles into the fleet is economically and practically feasible. Through <br /> the partnerships, ERMU will share the program's results and ongoing lessons with all interested <br /> parties, local and national. <br /> Diagram/Schematic <br /> 4 <br /> UTILITIES <br /> INCREASED <br /> ENERGY <br /> SALES <br /> increased Payment Use of <br /> in Lieu of Taxes and Renewable <br /> Fuel Revenue Energy <br /> Stays Local p <br /> Electric <br /> Vehicles <br /> DECREASED REDUCED <br /> TRANSPORTATION cleaner Air in GREEN HOUSE <br /> COSTS Urban Areas GASES <br /> '� rp <br /> CUSTOMER ENVIRONMENT <br /> 6 <br /> 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.