My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.3. ERMUSR 09-10-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
09-10-2019
>
2.3. ERMUSR 09-10-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 3:06:13 PM
Creation date
9/6/2019 4:15:26 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
9/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Peak Day 4.8 Million Gallons <br /> Water System Capacity 9.5 Million Gallons <br /> Key Personnel & Phone Numbers <br /> Name Organization Title Phone <br /> Troy Adams Elk River Municipal Utilities General Manager 763.441.2020 <br /> Calvin Portner City of Elk River City Administrator 763.635.1000 <br /> Conservation and Key <br /> Tom Sagstetter Elk River Municipal Utilities Accounts Manager 763.441.2020 <br /> Communication and <br /> Executive Administrative <br /> Michelle Canterbury Elk River Municipal Utilities Manager 763.441.2020 <br /> Tony Mauren Elk River Municipal Utilities Communication Specialist 763.441.2020 <br /> Amanda Bednar City of Elk River Environmental Coordinator 763.635.1000 <br /> Don Horvath Andy's Electric Master Electrician 612.669.6195 <br /> Brian Levin ChargePoint Sales Director 847.903.6652 <br /> Project Subject Areas <br /> Greenhouse gas reduction, clean air, time-of-use rates, residential electric vehicle charging, <br /> ChargePoint, electric vehicle fleet suitability assessment, electric vehicle fleets, public charging <br /> stations, in-home electric vehicle charging program, public charging installation costs, beneficial <br /> electrification, community partnerships. <br /> Results to Date <br /> • Created and launched a new electric vehicle brand for Elk River Municipal Utilities. <br /> • Implemented time-of-use rates for public charging stations and revised public charging <br /> rates to reflect energy only charges with no time-of-use based on customer feedback. <br /> • Completed an Electric Vehicle Fleet Assessment in partnership with the City of Elk River. <br /> • Purchased a battery electric Chevrolet Bolt, and assisted the City of Elk River with the <br /> lease of a plug-in hybrid Mitsubishi Outlander. <br /> • Participated in policy discussions with stakeholders in Minnesota on how electric <br /> vehicles are "beneficial electrification". <br /> • Increased participation in the in-home, time-of-use charging program from two <br /> participants to eleven. <br /> • Installed one public DC fast charger in partnership with a local grocery store (Coborn's). <br /> • Installed two public level two chargers in public parking lots in Elk River, MN. <br /> Project Description <br /> Elk River Municipal Utilities (ERMU) will develop an electric vehicle program that will shift the <br /> market from the standard internal combustion engine vehicle to electric vehicles. ERMU will do <br /> this by reducing range anxiety about electric vehicle technology through installing public <br /> charging stations. ERMU will also work closely with the City of Elk River to take advantage of the <br /> community outreach and educational opportunities with the city's Energy City Commission and <br /> the Green Step Cities Initiative. In addition, ERMU will provide incentives to customers who <br /> 2 <br /> 71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.