Laserfiche WebLink
2. Unless otherwise specified on the plans,all application rates for MnDOT mixes, except temporary seed, <br /> are 150 percent the specified rate. <br /> 3. Type 1 mulch shall consist of clean straw with no pasture hay. <br /> 4. Seed must be obtained from as close to the project site as reasonably possible with an emphasis on <br /> obtaining seed from the local ecotype region. <br /> 5. Source identified (Yellow tag)seed through the Minnesota Crop Improvement Association (MCIA) <br /> unless otherwise approved by the Engineer. <br /> 6. All seed shall be supplied as pure-live seed (PLS). <br /> 7. All seed and seed mixes shall conform to State seed requirements for noxious weed content. <br /> 8. All seed and seed mixes shall conform to State labeling requirements. For all species in the mix,the <br /> label and or invoice shall include the county of origin,and if from Canada,the province. <br /> B. Sodding Items <br /> 1. Unless otherwise indicated on the plans,sod shall be Lawn Sod as defined in the referenced <br /> specification except when located within MnDOT right-of-way where Salt Tolerant Sod shall be utilized. <br /> C. Imported Topsoil <br /> 1. Unless otherwise indicated on the plans, imported topsoil borrow for general use as a turf growing <br /> medium shall comply with MnDOT 3877.2.A. <br /> 2. Unless otherwise indicated on the plans, imported topsoil borrow for use as a plant growing medium in <br /> designated areas such as landscape beds shall meet the requirements of MnDOT 3877.2.B. <br /> D. Fertilizer <br /> 1. Fertilizer shall be Type 3(22-5-10). <br /> 2. Fertilizer shall be applied at a rate of 350 Ib/acre. <br /> E. Hydraulic Matrix <br /> 1. Hydraulic Matrix shall be MnDOT Type Bonded Fiber Matrix <br /> 2. Hydraulic Matrix shall be applied at a rate of 3500 lbs/acre(dry weight) <br /> PART 3-- EXECUTION <br /> 3.1 CONSTRUCTION REQUIREMENTS <br /> A. GENERAL <br /> 1. The subgrade shall be shaped to the approximate contour of the finished surface. All construction <br /> debris shall be removed from the area prior to the placement of the topsoil. The subgrade shall be <br /> loosened with a disc or harrow to a depth of 6.0-inches prior to application of the topsoil. <br /> 2. The topsoil shall be shaped to the approximate contour of the finished surface,with a minimum depth <br /> of 4.0-inches, unless otherwise shown on the plan. All construction debris, rocks and trash shall be <br /> removed from the area prior to seeding or sodding. The topsoil shall be loosened with a disc or harrow <br /> to its full depth prior to seeding or sodding. <br /> 3. The Contractor shall be responsible for providing water and maintenance for a period of 30 calendar <br /> days,or until final acceptance by the Owner,to firmly establish the seed or sod. The term maintenance <br /> shall include mowing,weed control and watering,as necessary. Failure to perform this work within <br /> 24-hours of notification of non-compliance may result in the Owner or Engineer arranging for <br /> completion of the work by others. A contract deduction shall be made equal to the total of all costs to <br /> City of Elk River-R13.119052 TURF RESTORATION <br /> August 2019 PAGE 02920-2 <br /> V122917©Bolton&Menk,Inc.2019,All Rights Reserved <br />