My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-19-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
08-19-2019
>
4.7. SR 08-19-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 3:32:57 PM
Creation date
8/15/2019 3:26:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02920-TURF RESTORATION <br /> PART 1-- GENERAL <br /> 1.1 SUMMARY <br /> A. This section covers the furnishing of all labor, materials,tools,equipment and performances of all work and <br /> services necessary or incidental to turf restoration as indicated on the drawings or as specified herein. <br /> B. A variety of different seeding mixtures may be utilized on this project. The Contractor shall refer to the plan <br /> for the locations of the different turf establishment areas. <br /> C. Temporary seeding may be necessary during construction in erosion sensitive areas. The Contractor shall <br /> do temporary seeding work as specified herein or as directed by the Engineer. <br /> 1.2 METHOD OF MEASUREMENT AND PAYMENT <br /> A. Measurement and compensation for the following items shall be paid according to the referenced <br /> specification or as modified below: <br /> 1. All measurements for payments for turf establishment items shall be based on the Unit Price bid per <br /> item. <br /> B. The furnishing and installing specific items and/or the performance of work under certain circumstances <br /> shall not be individually paid in the absence of a specific bid item for the work. The costs shall be included <br /> in the unit price bid for the associated seeding and sodding items. Such items of work include but are not <br /> limited to: <br /> 1. Application of starter fertilizer on all areas to be sodded shall be included in the price bid for sodding. <br /> 2. Subgrade preparation and topsoil placement as required on all areas shown on the plans. <br /> 3. Maintenance of newly sodded and seeded areas,as specified, include in the unit price for the <br /> associated items. <br /> 4. Stapling of sod on sloped areas, include in the unit price bid for sodding. <br /> 1.3 SPECIFICATION REFERENCES <br /> A. Mn DOT 2574—Soil Preparation <br /> B. Mn DOT 2575-Establishing Turf and Controlling Erosion <br /> C. Mn DOT 3876—Seed <br /> D. Mn DOT 3877-Topsoil <br /> E. Mn DOT 3878-Sod <br /> F. MnDOT 3881-Fertilizer <br /> G. MnDOT 3882-Mulch Material <br /> H. MnDOT 3884-Hydraulic Erosion Control Products <br /> I. Unless noted otherwise,the provisions in this section are in addition to the referenced specification. <br /> PART 2-- PRODUCTS <br /> 2.1 MATERIALS <br /> A. Seeding <br /> 1. The seed mixture to be used shall be: 25-151 <br /> City of Elk River-R13.119052 TURF RESTORATION <br /> August 2019 PAGE 02920-1 <br /> V122917©Bolton&Menk,Inc.2019,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.