My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 08-19-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
08-19-2019
>
4.7. SR 08-19-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 3:32:57 PM
Creation date
8/15/2019 3:26:13 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sampling and Testing Test Reference(Laboratory <br /> Production Test Rates(each mix type) Manual unless otherwise Spec Section <br /> indicated) <br /> Bulk Specific Gravity Divide the planned 1806 2360.2.G.7.b <br /> Maximum Specific Gravity production by 500. Round 1807 2360.2.G.7.c <br /> Air Voids(calculated) up to the next whole 1808 2360.2.G.7.d <br /> Asphalt Content number 1853 2360.2.G.7.a <br /> Add AC/Total AC Ratio <br /> (calculated) 1853 2360.2.G.7.a <br /> Adj.AFT(Calculated) 1854 2360.2.E.7.e <br /> Gradation 1 gradation per 500 tons <br /> or portion thereof(at least 1203 2360.2.G.7.f <br /> one per day) <br /> Coarse Aggregate 1 test per 500 tons or <br /> Angularity portion thereof. If CAA>8 <br /> percent of requirement, 1 1214 2360.2.G.7.g <br /> sample per day but test 1 <br /> per week. <br /> Fine Aggregate Angularity 1 test per 500 tons or <br /> (FAA) portion thereof. If FAA>5 <br /> percent of requirement, 1 1213 2360.2.G.7.h <br /> sample per day but test 1 <br /> per week. <br /> Fines to Effective Asphalt Divide the planned <br /> 2360.2.G.7.f <br /> Ratio(calculated) production by 500. Round <br /> 1203& 1853 & <br /> up to the next whole <br /> 2360.2.G.7.a <br /> number <br /> TSR As directed by the <br /> 1213 2360.G.7.i <br /> Engineer <br /> Aggregate Specific Gravity As directed by the 1204, 1205, and 181 2360.G.7.j <br /> Engineer <br /> Mixture Moisture Content Daily unless otherwise 1805 2360.G.7.k <br /> required by the Engineer <br /> Asphalt Binder As directed by the MnDOT Bituminous <br /> Engineer] Manual 2360.G.7.1 <br /> 5-693.920 <br /> 2. For projects with more than 2000 tons of a particular mix type,testing shall be performed at the rates <br /> specified in Tables 2360-10 and 2360-11 of the referenced specification. <br /> 3. Contractor shall send a copy of the testing results to the Engineer. <br /> 4. Should any of the specified tests fail,the Contractor shall notify the Engineer immediately and shall <br /> arrange and pay for additional test as may be necessary to satisfy the Engineer that the requirements <br /> have been met. <br /> ****END OF SECTION**** <br /> City of Elk River-R13.119052 PLANT-MIXED BITUMINOUS SURFACING <br /> August 2019 PAGE 02740-4 <br /> V050208©Bolton&Menk,Inc.2019,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.