1.2 METHOD OF MEASUREMENT AND PAYMENT <br /> A. Traffic Control shall be measured by the LUMP SUM and paid in accordance with the following schedule. <br /> 1. On the first partial estimate that shows work performed on at least one major contract item, <br /> 25 percent of the amount bid for Traffic Control will be paid, but not more that 3 percent of the original <br /> Contract amount. <br /> 2. On subsequent partial estimates, payment shall be made at the same percentage as the value of work <br /> completed to date relative to the original Contract amount,except that payment shall not be reduced <br /> from the original 25 percent. Materials on hand shall be excluded from the payment ratio <br /> computation. <br /> 3. At such time that 95 percent of the original Contract amount is earned,full payment for Traffic Control <br /> shall be made. <br /> PART 2-- PRODUCTS(NOT USED) <br /> PART 3-- EXECUTION <br /> 3.1 CONSTRUCTION REQUIREMENTS <br /> A. The Contractor shall notify the Engineer in writing at least 72 hours prior to the start of any construction <br /> operation that will necessitate lane closure or internal traffic control signing. <br /> B. The traffic control devices required along the project corridor shall be delivered and installed prior to the <br /> start-up of the work. <br /> C. The Contractor shall maintain traffic through the intersections whenever possible. <br /> D. The Contractor shall monitor and maintain all traffic control devices. <br /> ****END OF SECTION**** <br /> City of Elk River-R13.119052 MAINTENANCE AND CONTROL OF TRAFFIC <br /> August 2019 PAGE 01555-2 <br /> V040110©Bolton&Menk,Inc.2019,All Rights Reserved <br />