Laserfiche WebLink
1. The Contractor shall furnish all sample materials required for these tests and shall deliver the same <br /> without charge to the testing laboratory or other designated agency when and where directed by <br /> them. <br /> D. Additional Tests <br /> 1. In addition to those tests required by the individual technical specifications and/or referenced <br /> specifications: <br /> (a) Additional tests required beyond these required under this specification may be ordered by the <br /> Engineer to settle disagreements with the Contractor regarding quality of work done. If the work <br /> is defective,the Contractor shall pay all costs of the additional tests and shall correct the work. If <br /> the work is satisfactory,the Owner will pay for the additional tests. <br /> (b) The Owner may perform televised inspection of any and/or all underground construction included <br /> in this project,at its own expense,at any time prior to final payment. All deficiencies discovered in <br /> the course of such investigation shall be corrected at the Contractor's expense and,the Owner's <br /> satisfaction, prior to final payment. <br /> 1.4 ENGINEER'S REPRESENTATIVES AND TESTING <br /> A. The Engineer may provide a Resident Project Representative(RPR)to ascertain that the work is <br /> accomplished properly and in accordance with the plans and specifications. The RPR shall have full access <br /> to the work and shall be given full cooperation. The RPR shall have the authority,subject to the final <br /> decision of the Engineer,to reject any defective work or material. The RPR shall have no authority to <br /> permit any deviation from the plans and specifications except on written order from the Engineer. <br /> B. The presence of the Engineer or any RPRs, however,shall not relieve the Contractor of the responsibility for <br /> the proper execution of the work in accordance with all requirements of the Contract Documents. <br /> Compliance is a duty of the Contractor,and said duty shall not be avoided by any act or omission on the <br /> part of the Engineer or any RPRs. <br /> 1.5 SITE INVESTIGATION AND CONTROL <br /> A. The Contractor shall verify all dimensions in the field and shall check field conditions continuously during <br /> construction. The Contractor shall be solely responsible for any inaccuracies built into the work due to his <br /> failure to comply with this requirement. <br /> B. The Contractor shall inspect related and appurtenant work and shall report in writing to the Engineer any <br /> conditions,which will prevent proper completion of the work. Failure to report any such conditions shall <br /> constitute acceptance of all site conditions,and any required removal, repair or replacement caused by <br /> unsuitable conditions shall be performed by the Contractor at his sole cost and expense. <br /> 1.6 RIGHT OF REJECTION <br /> A. The Engineer,acting for the Owner,shall have the right,at all time and places,to reject any articles or <br /> materials to be furnished hereunder which in any respect,fail to meet the requirements of these <br /> specifications, regardless of whether the defects in such articles or materials are detected at the point of <br /> manufacture or after completion of the work at the site. If the Engineer or RPR,through an oversight or <br /> otherwise, has accepted materials or work which is defective or which is contrary to the specifications,such <br /> material, no matter in what stage or condition of manufacture,deliver,or erection,may be rejected by the <br /> Engineer for the Owner. <br /> PART 2-- PRODUCTS(NOT USED) <br /> PART 3-- EXECUTION(NOT USED) <br /> ****END OF SECTION**** <br /> City of Elk River-R13.119052 QUALITY CONTROL <br /> August 2019 PAGE 01450-2 <br /> V040110©Bolton&Menk,Inc.2019,All Rights Reserved <br />