Laserfiche WebLink
<br />N:\Departments\Community Development\Planning\Case Files\P\P 18-02 Miske Meadows 4th - Paxmar\5-City Council\8.1 sr Miske 4th - <br />Final.docx <br />the cul-de-sac at the end of Lincoln Street and constructing the roadway connection to city standard. A <br />sidewalk along the north side of Lincoln Street to the current construction limits is also included. <br /> <br />Sunset Ridge Connection <br />The right-of-way for the extension of Lincoln Street was included with the plat of Sunset Ridge and the <br />connection has always been planned. Staff recommends fully constructing the extension and leaving the <br />roadway open for use by the public. If the connection is not completed as part of this subdivision, future <br />construction costs will be assessed to the adjacent property owners. If the Council desires, breakaway <br />barriers or other access control measures could be used to delay use by the public. <br /> <br />Sherburne County began the Twin Lakes Road Corridor study and the city informed them of the safety <br />concerns with the intersection of Lincoln and Twin Lakes Road. This study will help determine the best <br />solution for addressing the safety concerns of residents in the Sunset Ridge development. <br /> <br />Financial Impact <br />None <br /> <br />Attachments <br /> Final Plat Received January 29, 2018 <br /> Street and Utility Plans dated January 29, 2018 <br /> Final Plat overlay <br /> Staff Comment Letter dated February 13, 2018 <br /> Final Plat Resolution <br />