My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.9. SR 08-05-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
08-05-2019
>
4.9. SR 08-05-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 9:32:48 AM
Creation date
8/1/2019 9:17:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/5/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Approach, Page 14 <br />Project Approach - Section 3 <br />Task 6 – Utility Design Meeting <br />Coordinate a meeting with Elk River Municipal Utilities and the small utilities as required. We will <br />coordinate and attend the utility design meeting. The goal is to define potential conflicts and to provide <br />the utility companies with advance notice of the project to avoid construction delays. <br />Task 7 – Construction Drawings <br />Prepare detailed construction drawings for review by the City. We anticipate that a typical plan set will <br />include: <br />1. Title Sheet <br />2. Construction Notes <br />3. Standard Plates <br />4. Schedules <br />5. Typical Sections and Details <br />6. Existing Conditions <br />7. Removals <br />8. List of Estimated Quantities <br />9. Street and Stormwater Plan and Profiles <br />10. Utility Plan and Profiles <br />11. Traffic Control and Staging Plans <br />12. Signage and Striping Plan <br />13. Contractor Storage Area <br />14. Erosion and Sediment Control <br />15. Cross Sections <br />Task 8 – Prepare Final Documents <br />Prepare final drawings, estimated quantities, specifications, conditions of the contract and bidding <br />requirements. Coordinate these plans and specifications with the permitting agencies. <br />Task 9 – Final Construction Cost Estimate <br />Finalize the estimated cost of construction and value engineer as required to maintain budget. <br />Task 10 – Quality Control Review <br />Schedule and conduct an in-house quality control review of the final draft of the construction documents. <br />Deliverables: Final construction drawings and specifications, and final construction <br />cost estimate. <br />Phase 14 – Project Submittal and Bidding <br />Task 1 – Pre-bid Conference <br />Coordinate and attend pre-bid conference if the City requests one. <br />Task 2 – Bidding Process <br />Respond to Contractor questions, review and approve proposed Contractor <br />substitutions in coordination with the City. Prepare and coordinate any necessary
The URL can be used to link to this page
Your browser does not support the video tag.