My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 06-03-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-03-2019
>
8.1. SR 06-03-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:05:20 PM
Creation date
5/30/2019 3:36:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W <br /> WASTE MANAGEMENT <br /> 9.1.2 Each Unit Price shall include an amount to cover Contractor's overhead and profit for each <br /> separately identified item. <br /> 9.1.3 The quantities indicated in the Agreement have been estimated by Owner for contracting and <br /> comparison purposes. No Claim shall be made against Owner for any excess or deficiency therein. <br /> Payment at the prices stated in the Agreement shall be in full for the completed Unit Price Work, <br /> and will cover materials, supplies, labor, tools, machinery and all other expenditures incidental to <br /> satisfactory completion of the Unit Price Work, subject only to adjustments for Major Items as set <br /> forth in Article 9.1.5. <br /> 9.1.4 Owner may increase or decrease (including totally eliminate)quantities of Unit Price Work at any <br /> time. Contractor will be entitled to payment only for the actual quantities of items provided at the <br /> Unit Prices set forth in the Agreement, subject only to adjustments for Major Items as set forth in <br /> Article 9.1.5. <br /> 9.1.5 At the request of either Party and subject to the provisions of Article 15 regarding Claims and <br /> disputes, the Unit Price for any Major Item shall be equitably adjusted when actual quantity of <br /> such Item varies from the estimated quantity for such Item by more than twenty-five percent of <br /> the original estimated quantity included in Exhibit A. Such adjustment shall reflect any over or <br /> under allocation of overhead and profit in the Item due to the variation in the actual quantity of the <br /> item from the estimated quantity. The amount of the adjustment, if any, is subject to Owner's <br /> right to audit Contractor's actual costs incurred in completing the Major Item Work. <br /> 9.2 Schedule of Values (Lump Sum Work). <br /> 9.2.1 For Work contracted on a Lump Sum basis,ten (10)Days before the first Application for Payment, <br /> the Contractor shall submit to Owner's Authorized Representative a Schedule of Values allocating <br /> the Contract Price to the various portions of the Work, prepared in such form and supported by <br /> such data as the Owner's Authorized Representative may require to substantiate its accuracy. <br /> This schedule, as approved by the Owner's Authorized Representative, shall be used as a basis <br /> for reviewing Contractor's Applications for Payment for Lump Sum Work. <br /> 9.2.2 In the event Owner permits a separate line item in the Schedule of Values for mobilization, the <br /> maximum percentage that may be allocated for mobilization in the Schedule of Values is ten <br /> percent(10%)of the Contract Price. <br /> 9.2.3 In the event Owner permits a separate line item in the Schedule of Values for General Conditions, <br /> the maximum percentage that may be allocated for General Conditions in the Schedule of Values <br /> is ten percent(10%)of the Contract Price. <br /> 9.3 Cash Allowances <br /> 9.3.1 Contractor shall include in the Contract Price all allowances provided for in the Contract Documents <br /> for: <br /> .1 services, utility relocations, permits, or other similar costs; and <br /> .2 materials and equipment. <br /> Items covered by an allowance shall be supplied for the price determined under Article 9.3.2.4 and <br /> by such persons or entities as Owner may direct, but Contractor shall not be required to employ <br /> persons or entities against which Contractor makes reasonable objection. <br /> 9.3.2 Unless otherwise stated in the Contract Documents: <br /> .1 materials and equipment under an allowance shall be selected promptly by Owner within <br /> the time limits for processing submittals; <br /> .2 allowances shall cover the cost to Contractor of services completed or materials and <br /> equipment delivered at the Site and all required taxes, less applicable trade discounts; <br /> .3 Contractor's costs for administering services, unloading and handling products at the Site, <br /> labor, installation costs, overhead, profit, and other expenses contemplated for the <br /> allowance shall be included in the Contract Price and not in the allowance; and <br /> 28 Jun-17 <br /> Ver.2.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.