My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 06-03-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-03-2019
>
8.1. SR 06-03-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:05:20 PM
Creation date
5/30/2019 3:36:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
written order to the Contractor. Failure to perform this work within 24 hours of notification of non- <br /> compliance may result in the Owner or Engineer arranging for completion of the work by others. <br /> D. A contract deduction shall be made equal to the total of all costs incurred by the Owner due to failure of <br /> the Contractor to take corrective action within the timeframe of any written notice of non-compliance. <br /> Such costs include but are not limited to: labor,materials,equipment and administrative costs. <br /> 3.3 TRAINING <br /> A. Contractor shall ensure the individual(s)designated by the Contractor for this project to perform the <br /> Construction SWPPP Manager and Installation Supervision duties have been trained in accordance with <br /> Minnesota Pollution Control Agency(MPCA)General Storm Water Permit for Construction Activity(MN <br /> R100001)training requirements. <br /> B. Documentation incorporated by the Contractor into the SWPPP must include either: <br /> 1. Proof of a current certification through the University of Minnesota Erosion and Stormwater <br /> Management Certification Program,or <br /> 2. Documentation of training satisfactory to the MN Pollution Control Agency showing training is <br /> commensurate with the individual's job duties. <br /> 3.4 TERMINATION OF COVERAGE <br /> A. Upon completion of all final stabilization,the Contractor shall provide the Engineer a signed MN MPCA <br /> Notice of Termination (NOT)form and a PDF copy of the SWPPP Documentation. Final payment shall not be <br /> made for the project until the NOT is submitted and the SWPPP Documentation is received. <br /> B. The NOT form is available on the MPCA website at: http://www.pca.state.mn.us/index.phP/water/water- <br /> types-and-programs/stormwater/construction-stormwater/index.html <br /> ****END OF SECTION**** <br /> Elk River Landfill, Inc. -R16.115896 EROSION&SEDIMENT CONTROL <br /> March 2019 PAGE 02370-4 <br /> V121917©Bolton&Menk,Inc.2018,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.