My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 06-03-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-03-2019
>
8.1. SR 06-03-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:05:20 PM
Creation date
5/30/2019 3:36:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2-- PRODUCTS <br /> 2.1 NO EXCEPTION TO THE REFERENCED SPECIFICATION IS MADE. <br /> PART 3-- EXECUTION <br /> 3.1 CONSTRUCTION REQUIREMENTS <br /> A. Remove existing bituminous drives and other specified items where shown on the plans and/or required for <br /> the construction of the project. <br /> B. Saw cut bituminous and concrete surfaces prior to excavation,to produce a clean-cut breakage joint. <br /> C. Dispose of all concrete and bituminous removal items, rubbish and debris outside of the construction zone. <br /> It shall be the Contractor's responsibility to secure all required permits and pay all fees associated with the <br /> disposal of the material and to secure the disposal site. <br /> D. Remove street/traffic signs and similar structures that must be removed to construct the project. Restore <br /> these facilities to the original location or a location designated by the Owner,when work has progressed <br /> past the location of the structure. <br /> E. The Contractor shall take full responsibility to protect structures or other surface improvements from <br /> damage that are not to be removed. If damage to these facilities occurs due to the construction of the <br /> project,the Contractor shall replace or repair them. <br /> F. The Owner will designate which existing items removed as part of the construction,are to be salvaged. All <br /> other items shall be disposed by the Contractor. <br /> G. All existing sanitary sewer and storm sewer pipe being removed and replaced by new improvements shall <br /> be considered as debris and removed during the construction process. <br /> H. Where existing pipes are to be abandoned in place,the pipe shall be filled with sand or flowable fill as <br /> noted on the plans. The exposed pipe ends shall be bulkheaded shut with a watertight non-shrink concrete <br /> grout at a thickness of not less than one pipe diameter. <br /> ****END OF SECTION**** <br /> Elk River Landfill, Inc. -R16.115896 REMOVING PAVEMENT AND MISCELLANEOUS STRUCTURES <br /> March 2019 PAGE 02220-2 <br /> V12222017©Bolton&Menk,Inc.2018,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.