My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 06-03-2019
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2019
>
06-03-2019
>
8.1. SR 06-03-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 4:05:20 PM
Creation date
5/30/2019 3:36:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01330-SUBMITTALS <br /> PART 1-- GENERAL <br /> 1.1 SUMMARY <br /> A. The Contractor shall submit electronic pdf copies of all required submittals and sample items as noted <br /> below. The Engineer will review them with reasonable promptness.The Contractor shall make all required <br /> corrections and file with the Engineer three corrected sets for final review. <br /> B. The responsibility for completeness of submittals lies with the Contractor. If the Engineer and/or Owner <br /> sign the submittal with no exception taken,such action shall not absolve the responsibilities of the <br /> Contractor in any way. <br /> 1.2 ITEMS TO BE SUBMITTED <br /> A. Written Progress Management Schedule Tool (as defined in Section 01310)-to be reviewed at the <br /> Preconstruction Conference. See Article 4 of Section 00520"Agreement"of this Project Manual for <br /> contractual time requirements. <br /> B. Minnesota Pollution Control Agency(MPCA)-General Storm Water Permit for Construction Activity(MN <br /> R100001)—Reference Section 02370"Erosion &Sediment Control"of this Project Manual. <br /> C. Concrete Mix Design <br /> D. Bituminous Mix Design (wear and non-wear) <br /> E. Gradation Test Results from 2 separate tests,as required in Source Quality Control provisions of individual <br /> sections contained herein,from material stockpiles of aggregates to be used on this project. These tests <br /> may be run by the Contractor or its supplier during aggregate production. <br /> F. Geotextile Fabrics-Certificates of Compliance. <br /> G. Sanitary Sewer& Forcemain <br /> 1. Manhole structure-shop drawings. <br /> 2. Manhole casting-shop drawings. <br /> 3. Piping and fittings-Certificates of Compliance. <br /> 4. Air Relief Valves—shop drawings. <br /> H. Seeding-Certificates of Compliance for seed mixture. <br /> I. Lift Stations <br /> 1. Pumps& Panels-shop drawings <br /> 2. Electrical Generator—shop drawings. <br /> 3. Valve Manhole-shop drawings. <br /> 4. Valves-shop drawings and Certificates of Compliance. <br /> 5. Chain Link Fence—shop drawings. <br /> 6. Maintenance and Operations Manuals. <br /> 1.3 MATERIAL SAFETY DATA SHEETS <br /> A. The Contractor shall submit two copies of Safety Data Sheets(SDSs) (formerly known as Material Safety <br /> Data Sheets or MSDSs)for each material on site to the OWNER. <br /> B. The Contractor shall maintain an orderly file of Safety Data Sheets at the job site. <br /> 1.4 RECORD DRAWINGS <br /> Elk River Landfill, Inc. -R16.115896 SUBMITTALS <br /> March 2019 PAGE 01330-1 <br /> V062612 ©Bolton&Menk,Inc.2018,All Rights Reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.