Laserfiche WebLink
27. Bid Item A-27: Silt Fence,Type Heavy Duty <br /> (a) This item pertains to the furnishing and installing of silt fence for the purposes of containing <br /> erosion sediment with the project site. There are numerous locations of called out on the plan and <br /> in general is at every location where excavation occurs,which includes all drill pits,connection <br /> points and Lift Station 1 site. <br /> (b) Reference specification Section 02370—Erosion &Sediment Control <br /> 28. Bid Item A-28: Fertilizer,Type 3 <br /> (a) This item pertains to the spreading of fertilizer at all locations where turf restoration occurs <br /> through seeding and blanketing. <br /> (b) Reference specification Section 02920—Turf Restoration <br /> 29. Bid Item A-29: Erosion Control Blanket Category 3P <br /> (a) This item pertains to the covering of all turf restoration areas with erosion control blanket. <br /> (b) Reference specification Section 02920—Turf Restoration <br /> 30. Bid Item A-30: Seeding, Mixture 25-121 <br /> (a) This item pertains to the payment for seed used on all turf restoration areas. <br /> (b) Reference specification Section 02920—Turf Restoration <br /> 31. Bid Item A-31: 4"Solid Line Paint <br /> (a) This item pertains to the marking of parking stalls and prohibited parking areas on the pavement of <br /> the parking lot of the Lift Station 1 site area. <br /> (b) Reference specification Section 02749—Pavement Marking <br /> 32. Bid Item A-32: Pavement Message Paint—Handicap Parking <br /> (a) This item refers to the painting of the handicap symbol in a parking stall of the parking lot of the <br /> Lift Station 1 site. <br /> (b) Reference specification Section 02749—Pavement Marking. <br /> 33. Bid Item A-33: Prefabricated Parking Stop <br /> (a) This item refers to the furnishing and installing of parking stops in each stall of the parking lot of <br /> the Lift Station 1 site. <br /> (b) Reference specification Section 02779—Prefabricated Parking Stops. <br /> H. Bid items beginning with a "B"are associated with the landfill side improvements of the project, beginning <br /> at the forcemain connection at the Lift Station 1 wet well at 197+68, up to the connection at the main <br /> pumphouse near Station 251+50,along with all other associated improvements on the landfill site. These <br /> bids are described as follow: <br /> 1. Bid Item B-1: Construction Surveying <br /> (a) This item pertains to the establishment of all reference points(construction stakes) necessary to <br /> construct the work between Station 198+75 and 251+21, in accordance with the plans and these <br /> specifications. <br /> (b) Reference specification Section 01720—Field Engineering <br /> 2. Bid Item B-2: Mobilization <br /> (a) This item covers the mobilization of all labor, materials,tools,equipment and performances of all <br /> work and services necessary or incidental to construct the project between Station 198+75 and <br /> 251+21, including but not limited to,the demobilization associated with closing the project, <br /> removing all equipment, removing excess materials,and general clean-up. <br /> Elk River Landfill, Inc. -R16.115896 SUMMARY OF WORK <br /> March 2019 PAGE 01110-7 <br /> V040111 ©Bolton&Menk,Inc.2018,All Rights Reserved <br />