My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. PCSR 05-28-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2019
>
05-28-2019
>
4.1. PCSR 05-28-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 9:19:15 AM
Creation date
5/24/2019 9:08:29 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. A PUD shall be served by adequate transportation, water, sanitary sewer and drainage systems. <br />The project area will be served by public services, and will not adversely impact transportation <br />networks within the area. <br /> <br />7. A PUD shall not adversely affect existing or proposed parks, schools, streets or other public facilities. <br />Existing public facilities are not impacted by the proposed project. However, the planned cul-de- <br />sac on Line Ave. requires dedication of additional right-of-way. <br /> <br />8. The council may establish varied and reasonable lot area, frontage, side yard, and setback requirements for a <br />PUD and may authorize a density which it determines to be appropriate under the circumstances. Any permitted <br />density shall be consistent with the city's comprehensive plan and not adversely affect the public health, safety and <br />welfare. <br />The proposal is consistent with densities described in the Comprehensive Plan, setbacks from <br />public rights-of-way, and design standards for similar developments within city code. <br /> <br />9. More than one principal building may be constructed on a lot within a PUD if authorized by the council. <br />Unless otherwise permitted by the council, a PUD shall comply with the schedules of dimensional regulations set <br />forth in this article, except that individual lots shall have no less than 80 percent of the minimum area for similar <br />uses. <br />The project does not conflict with standards described in city code. <br /> <br />Preliminary Plat <br />City ordinance section 30-375 outlines the required findings for approval of a Preliminary Plat. <br />1. The proposed subdivision is consistent with the zoning regulations (article VI of this chapter) and conforms in all <br />respects with all requirements of this Code, including the zoning regulations and this article. <br />The proposed subdivision requires approval of a rezoning application. Provided the zoning is <br />amended to PUD, and recommended conditions are included, the proposed subdivision is <br />consistent with all zoning regulations. <br /> <br />2. The proposed subdivision is consistent with all applicable general and specialized city, county, and regional plans, <br />including, but not limited to, the city's comprehensive development plan. <br />The subdivision is consistent with all applicable plans. <br /> <br />3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to <br />erosion and siltation, susceptibility to flooding, and drainage are suitable for the type and density of development and <br />uses contemplated. <br />The physical characteristics of the site support the proposed use. Encroachments into the wetland <br />setback and buffer can be approved through the PUD process, but staff has included a condition <br />that encroachments closer than 25 feet from the wetland or stormwater pond are not permitted. <br /> <br />4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage transportation, <br />erosion control and all other services, facilities and improvements otherwise required in this article. <br />The subdivision includes public utilities and stormwater infrastructure that meets city requirements. <br />Additional permits required to comply with erosion control standards are a required, and must be <br />secured prior to building permit issuance. <br /> <br /> <br /> <br />N:\\Departments\\Community Development\\Planning\\Agendas\\PC Packets\\2019\\05-28-2019\\4.1 sr Tall Pines 2nd.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.