My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.8. ERMUSR 05-14-2019
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2019
>
05-14-2019
>
2.8. ERMUSR 05-14-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2019 12:09:04 PM
Creation date
5/10/2019 12:07:47 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> ultimately connects to. The Interconnection Customer must request additional Pre- <br /> Application Reports if information about multiple PCCs is requested. <br /> The Pre-Application Report will only include existing data. A request for a Pre- <br /> Application Report does not obligate the Area EPS Operator to conduct a study or other <br /> analysis of the proposed DER in the event that data is not readily available. The Area <br /> EPS Operator will provide the Interconnection Customer with the data that is available. <br /> The confidentiality provisions in Section 12.1 apply to Pre-Application Reports. <br /> 5.3. Pre-Application Report Components <br /> The Pre-Application Report shall include the following pieces of information provided <br /> the data currently exists and is readily available. <br /> • Total capacity (in megawatts (MW)) of substation/area bus, bank or circuit based <br /> on normal or operating ratings likely to serve the proposed Point of Common <br /> Coupling. <br /> • Existing aggregate generation capacity(in MW) interconnected to a <br /> substation/area bus, bank or circuit (i.e., amount of generation online) likely to <br /> serve the proposed Point of Common Coupling. <br /> • Aggregate queued generation capacity (in MW) for a substation/area bus, bank or <br /> circuit (i.e., amount of generation in the queue) likely to serve the proposed Point <br /> of Common Coupling. <br /> • Available capacity(in MW) of substation/area bus or bank and circuit likely to <br /> serve the proposed Point of Common Coupling (i.e., total capacity less the sum of <br /> existing aggregate generation capacity and aggregate queued generation <br /> capacity). <br /> • Substation nominal distribution voltage and/or transmission nominal voltage if <br /> applicable. <br /> • Nominal distribution circuit voltage at the proposed Point of Common Coupling. <br /> • Approximate circuit distance between the proposed Point of Common Coupling <br /> and the substation. <br /> • Relevant line section(s) actual or estimated peak load and minimum load data, <br /> including daytime minimum load and absolute minimum load, when available. <br /> • Whether the Point of Common Coupling is located behind a line voltage regulator. <br /> 10 <br /> 145 <br />
The URL can be used to link to this page
Your browser does not support the video tag.