SCHEDULE 3-DISTRIBUTED ENERGY RESOURCES INTERCONNECTION PROCESS <br /> Impact Study shall be subject to the assumptions set forth in this Agreement; including <br /> Attachment A. <br /> 3. A System Impact Study will be based upon the technical information provided by <br /> Interconnection Customer in the Interconnection Application. The Area EPS Operator <br /> reserves the right to request additional technical information from the Interconnection <br /> Customer as may reasonably become necessary consistent with Good Utility Practice <br /> during the course of the System Impact Study. <br /> 4. A System Impact Study may, as necessary, consist of a short circuit analysis, a stability <br /> analysis, a power flow analysis, voltage drop and flicker studies, protection and set point <br /> coordination studies, and grounding reviews. A System Impact Study shall state the <br /> assumptions upon which it is based, state the results of the analyses, and provide the <br /> requirement or potential impediments to providing the requested interconnection <br /> service, including a preliminary indication of the cost and length of time that would be <br /> necessary to correct any problems identified in those analyses and implement the <br /> interconnection. A System Impact Study shall provide a list of facilities that are required <br /> as a result of the Interconnection Application and non-binding good faith estimates of <br /> cost responsibility and time to construct. A Facilities Study may be required to identify <br /> all possibilities of facility upgrades, cost estimates and estimate of construction time. <br /> 5. A distribution System Impact Study shall incorporate a distribution load flow study, an <br /> analysis of equipment interrupting ratings, protection coordination study,voltage drop <br /> and flicker studies, protection and set point coordination studies, grounding reviews, <br /> and the impact on electric system operation, as necessary. <br /> 6. If the System Impact Study determines Affected Systems may be affected, a separate <br /> Transmission System Impact Study may be required. All Affected Systems shall be <br /> M-MIP System Impact Study Agreement_January 2019 2 <br /> 245 <br />